Topic

Operable windows in lieu of controls- what about WOCDs

CS-2009 IEQc6: Controllability of systems - thermal comfort
posted by Andreas Hintz on Jul 26, 2017, 9:02 am

For determing the openable wall area (which has to be a minimum of 4% of the net occupiable floor area) should WOCDs (Window Opening Control Devices) be considered? Please explain how to...

Last reply: Lauren Sparandara, Aug 7, 2017, 1:46 pm

Achieving this credit in a Shopping mall?

CS-2009 IEQc6: Controllability of systems - thermal comfort
posted by Maya Karkour on Mar 17, 2014, 8:04 am

Dear Sirs,

We have a mall seeking LEED C&S 2009. Most of the spaces will be tenanted. The owner will be installing the main HVAC system (Chillers & Boilers), whereas the tenants...

Last reply: Lauren Sparandara, Sep 20, 2016, 12:12 pm

C&S 2009 Retail tenant space

CS-2009 IEQc6: Controllability of systems - thermal comfort
posted by London Huenefeld on Apr 8, 2015, 2:22 pm

I am working on a C&S project in which most of the tenants are retail stores. To achieve this credit I am under the impression that complying spaces will be limited to office and...

Last reply: Lauren Sparandara, Sep 20, 2016, 12:11 pm

Number of thermal control panel and window needed

CS-2009 IEQc6: Controllability of systems - thermal comfort
posted by Cathy W on Sep 19, 2016, 12:07 am

It is a mechanical ventilated office building. To achieve this credit:
1. (For...

Last reply: Lauren Sparandara, Sep 20, 2016, 12:08 pm

Enough for credit compliance

CS-2009 IEQc6: Controllability of systems - thermal comfort
posted by Mathilda Jonsson on Apr 10, 2013, 3:27 am

Hi all!

My CS project is an office building. I'm wondering if it's enough if the project has individual radiant control but that there is a max limit of temperature and that the tenant can...

Last reply: Mathilda Jonsson, Aug 15, 2013, 1:55 am

Two methods: T-stats and windows in the same project?

CS-2009 IEQc6: Controllability of systems - thermal comfort
posted by Diana Nezamutinova on Aug 1, 2013, 11:52 am

Would a mechanically ventilated building be able to rely on 2 methods for documenting compliance: T-stats and windows? Some occupants will use one, while the others will rely on another. Would...

Last reply: Diana Nezamutinova, Aug 13, 2013, 5:53 am

C&S- How to treat different types of space

CS-2009 IEQc6: Controllability of systems - thermal comfort
posted by R Jones on Aug 12, 2013, 9:08 am

Our project is installing the fan coil units and each will be individually controllable. Its quite typical in the UK to have an open plan office with a mix of permanent workstations, "hot desks"...

Last reply: Lauren Sparandara, Aug 12, 2013, 1:10 pm

Proving compliance for a C&S project

CS-2009 IEQc6: Controllability of systems - thermal comfort
posted by Maya Karkour on Sep 14, 2010, 11:58 am

Hello,

Our project is a C&S office and the furniture layout is not yet known. The cooling and heating system will consist of a VRV. Thermostats and other controls will be installed...

Last reply: Lauren Sparandara, May 31, 2013, 1:21 pm

CS shopping mall- FTE

CS-2009 IEQc6: Controllability of systems - thermal comfort
posted by Adam Targowski on Dec 6, 2012, 10:40 am

I'm working on a core and shell shopping mall project and tenants will be responsable for HVAC equipment and thermostates installation in their spaces.
First of all I would like to ask how...

Last reply: Tristan Roberts, Jan 18, 2013, 4:23 pm

Operable windows as controls

CS-2009 IEQc6: Controllability of systems - thermal comfort
posted by Amanda Ross on Sep 14, 2011, 6:18 pm

Just to clarify: Each operable window counts as one control. Therefore if I have an open office space with 50 people within 20' of the exterior wall, then I need at least 24 windows and one...

Last reply: Amanda Ross, Nov 4, 2011, 7:40 pm