Low-Emitting Materials: Flooring IEQ c4.3

CI-2009 IEQc4.3:Low-Emitting Materials—Flooring Systems
posted by  Rezkar Abdulmajeed  on 

The requirements of this Credit exempts any mineral based finishes from Floor score certification such as tile, terrazzo, marble..... Can someone direct me if the Ceramic tile is included in this e

2
Mon Oct 24, 2016, 10:57 pm

Combination of New Build and Existing

NC-2009 EAp2:Minimum Energy Performance
posted by  Jordan Kirrane  on 

Hello, I am working on the major renovation of an existing office building and new construction of a new entrance/reception atrium.

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Mon Oct 24, 2016, 9:48 am

exemplary performance points - combined on-site and off-site ren

EBOM-2009 EAc4:On-Site and Off-Site Renewable Energy
posted by  Pablo Fortunato Suarez  on 

Our project has combined off-site and on-site renewable energy sources. The total threshold is over 98%.

4
NH Green Consulting
LEEDuser Premium Member
80 thumbs up
Mon Oct 24, 2016, 4:19 am

Plumbing Commissioning Scope Of Work

NC-v4 EAp1:Fundamental commissioning and verification
posted by  Dan Forino  on 

In LEED 4.0 it states that for plumbing all Domestic Hot Water Systems, pumps and controls.

4
LEED Fellow
Integrated Design + Energy Advisors, LLC
LEEDuser Expert
377 thumbs up
Fri Oct 21, 2016, 5:50 pm

contact GBCI

posted by  Tristan Roberts  on 
2
Thu Oct 20, 2016, 9:46 pm

Estimated Completion Date vs. IEQ testing

NC-2009 PIf4:Schedule and Overview Documents
posted by  Greengrade User  on 

I recall the form saying "estimated" completion date. What can you get away with with "estimated"?

5
Sustainable Design Director, Associate Principal
Opsis Architecture
LEEDuser Premium Member
54 thumbs up
Wed Oct 19, 2016, 10:24 pm

Decorative Exterior Lighting

NC-2009 EAp2:Minimum Energy Performance
posted by  Saif Abdulameer  on 

Hi everyone, I am working on a project that has exterior decorative lights such as tree lights, small umbrella lights etc.

2
ASHRAE BEMP HBDP - LEED GA, Building Performance Consultant
Zonda
LEEDuser Basic Member
14 thumbs up
Wed Oct 19, 2016, 9:57 pm

Equation2: Monthly harvested rainwater volume. (v4)

NC-v4 WEc1:Outdoor water use reduction
posted by  deepak cherukumilli  on 

Reference guide v4 BD+C:Page290: STEP 5: I didnot understand why a 0.15 is used in this equation. Is this for any kind of losses in the rain water storage process.

2
Sites Technical Specialist, LEED
USGBC
LEEDuser Premium Member
47 thumbs up
Wed Oct 19, 2016, 9:13 pm

pilot survey problems

Pilot-Credits EQpc78:Design for active occupants
posted by  M Bordeaux  on 

I have a LEED 2009 project and we are trying to go for a pilot credit - design for active occupants.

3
LEED Fellow 2011, Principal
Kath Williams + Associates
LEEDuser Premium Member
104 thumbs up
Wed Oct 19, 2016, 6:31 pm

New Option - Walking Path

Pilot-Credits EQpc78:Design for active occupants
posted by  Garrett Ferguson  on 

On a LEED-CI project where the interior will be renovated, the project owner encourages walking. A walking path has been provided that overlooks an atrium and is daylit with a skylight.

2
Default Avatar
Architect
Gresham Smith & Partners
LEEDuser Basic Member
6 thumbs up
Wed Oct 19, 2016, 6:05 pm