Low-Emitting Materials: Flooring IEQ c4.3
CI-2009 IEQc4.3:Low-Emitting Materials—Flooring Systemsposted by Rezkar Abdulmajeed on
The requirements of this Credit exempts any mineral based finishes from Floor score certification such as tile, terrazzo, marble..... Can someone direct me if the Ceramic tile is included in this e
Combination of New Build and Existing
NC-2009 EAp2:Minimum Energy Performanceposted by Jordan Kirrane on
Hello, I am working on the major renovation of an existing office building and new construction of a new entrance/reception atrium.
exemplary performance points - combined on-site and off-site ren
EBOM-2009 EAc4:On-Site and Off-Site Renewable Energyposted by Pablo Fortunato Suarez on
Our project has combined off-site and on-site renewable energy sources. The total threshold is over 98%.
Plumbing Commissioning Scope Of Work
NC-v4 EAp1:Fundamental commissioning and verificationposted by Dan Forino on
In LEED 4.0 it states that for plumbing all Domestic Hot Water Systems, pumps and controls.
Estimated Completion Date vs. IEQ testing
NC-2009 PIf4:Schedule and Overview Documentsposted by Greengrade User on
I recall the form saying "estimated" completion date. What can you get away with with "estimated"?
Decorative Exterior Lighting
NC-2009 EAp2:Minimum Energy Performanceposted by Saif Abdulameer on
Hi everyone, I am working on a project that has exterior decorative lights such as tree lights, small umbrella lights etc.
Equation2: Monthly harvested rainwater volume. (v4)
NC-v4 WEc1:Outdoor water use reductionposted by deepak cherukumilli on
Reference guide v4 BD+C:Page290: STEP 5: I didnot understand why a 0.15 is used in this equation. Is this for any kind of losses in the rain water storage process.
pilot survey problems
Pilot-Credits EQpc78:Design for active occupantsposted by M Bordeaux on
I have a LEED 2009 project and we are trying to go for a pilot credit - design for active occupants.
New Option - Walking Path
Pilot-Credits EQpc78:Design for active occupantsposted by Garrett Ferguson on
On a LEED-CI project where the interior will be renovated, the project owner encourages walking. A walking path has been provided that overlooks an atrium and is daylit with a skylight.