Forum quick links
Mechanical Ventilation for Multifamily Highrise Bedrooms
NC-2009 IEQp1:Minimum IAQ Performanceposted by Neil Sen on
I'm working on a Multifamily Highrise building. The bedrooms will not have operable windows, so it looks like they need to be mechanically ventilated.
LEED-2009 Materials and Resources Calculator (v06 & v07)
posted by Jon Clifford on
DES Option 1 – Streamlined Path
NC-2009 EAp2:Minimum Energy Performanceposted by Gopinath Vasu on
As per DES – Performance path option 1, the DES has to be modeled as purchased energy in both baseline and proposed case energy models. For proposed model, the pumps which are downstream equipment
swimming pool
NC-2009 SSc6.1:Stormwater Design—Quantity Controlposted by Melissa Merryweather on
Hi --can a swimming pool be considered a retention pond? And are swimming pools considered to be 100% pervious? Or is it a matter of whether the water is treated before re-use or release?
EAp2 V6 credit form vs V4 credit form
NC-2009 EAp2:Minimum Energy Performanceposted by Nativa Architecture on
Shall we use V4 credit form instead of V6 release currently used on LEED online ?
Health and Safety Specialist
Pilot-Credits EQpc44:Ergonomics approach for computer usersposted by Marissa Hebert on
The credit requirements state that the team should "Engage an Ergonomist or Health and Safety Specialist". What is a Health and Safety Specialist? Is this someone with Ergonomics training?
Definition of Landfill
NC-2009 MRc2:Construction Waste Managementposted by Adrian Arenas on
What is the definition of a landfill in the USA? In Mexico, we have what is called “Socavon” which is a site that has been exploited, usually with mining activities.
VOC limits?
NC-v4 EQc2:Low emitting materialsposted by Erin Holdenried on
Where is the VOC limit table for wet-applied products? I can't find any tables or mention of the referenced standards for VOC limits in the Reference Guide . . .
Evidences for thermal comfort in commercial kitchen
NC-2009 IEQc7.1:Thermal Comfort—Designposted by Ricardo Sá on
Hello, I'm currently working on a project of a huge office building with a small area for retail and a restaurant.
Could you explain the plan just one more time?
CS-2009 EAc5.2:Measurement and Verification—Tenant Submeteringposted by Charles Nepps on
I am still a bit unclear about the the M&V - Tenant Submetering documentation.