FAQs about EAp2 :

For a project outside the U.S., how do I determine the Target Finder score?

Do hotel rooms need automatic light shut-off control?

How commonly are the 90.1 mandatory compliance forms submitted as part of EAp2/EAc1?

The Section 9 space-by-space method does not include residential space types. What should I use?

Can the Passive House Planning Package (PHPP) be used to energy model for LEED?

Is it acceptable to model a split-type AC with inverter technology compressor as a heat pump, like modeling VRF?

Can the Trace 700 'LEED Energy Performance Summary Report' by uploaded to LEED Online in lieu of the Section 1.4 tables spreadsheet?

A portion of our building envelope is historic. Can we exclude it from our model?

Which baseline HVAC system do I use if my building has no heating or air conditioning?

For an existing building, do I need to rotate the model?

Our project has a diesel backup generator. Should we include it in our energy model?

Our project has a large process load—75%. Despite our efforts to make an efficient HVAC design, the cost savings are minimal. What can we do to earn this prerequisite and be eligible for LEED certification? Is there any flexibility in how we model the p

Can SHGC be higher in the proposed than in the baseline model?

Our process load is higher than 25%. Do we have to justify that?

Do I need to justify the electrical and fuel rates I am using in my model?

Our local code references ASHRAE 90.1-2010. Should I use that for my documentation, or 90.1-2007?

Can I claim exterior lighting savings for canopy lighting even though a baseline model cannot include shading elements?

The project is built on a site with existing exterior lighting installed. How should this be accounted for?

Can mezzanines open to floors below be excluded from the energy model?

How do I provide a zip code for an international location?

View answers »

Forum discussion

NC-2009 EAp2:Minimum Energy Performance

EAp2 V6 credit form vs V4 credit form

Shall we use V4 credit form instead of V6 release currently used on LEED online ? the LEED Release is 2009 ID+C retail. Our problem is the Additional Interior Lighting Power Allowance on retail project. If we use ASHRAE 91-2007 the Additional LPA is 2.6 W/ft2 (for Retail Area 3 type), but on the LEED online form the the Additional LPA is 1.4 W/ft2 as recommend from ASHRAE 91-2010, that we don't use it for this project. Do you know if we can decide to use the release before because on that the Additional LPA is compliance ASHRAE 91-2007

0

You rely on LEEDuser. Can we rely on you?

LEEDuser is supported by our premium members, not by advertisers.

Go premium for $15.95  »

Thu, 12/22/2016 - 20:53

-

Thu, 12/29/2016 - 17:50

For LEED 2009 projects you normally use 90.1-2007. Assuming you are asking the question in the right forum (2009 NC, EAp2), the additional allowance is based on the proposed design. You are allowed to install up to the allowance and not more. The Baseline model reflects the actual design as well. No savings are allowed to be claimed. You can request to use the older forms (v5) by contacting GBCI. Make sure to use the v5 form with the section 1.4 tables spreadsheet or use the v6 form with the Minimum Energy Performance Calculator. Do not mix the two.