FAQs about EAp2 :

For a project outside the U.S., how do I determine the Target Finder score?

Do hotel rooms need automatic light shut-off control?

How commonly are the 90.1 mandatory compliance forms submitted as part of EAp2/EAc1?

The Section 9 space-by-space method does not include residential space types. What should I use?

Can the Passive House Planning Package (PHPP) be used to energy model for LEED?

Is it acceptable to model a split-type AC with inverter technology compressor as a heat pump, like modeling VRF?

Can the Trace 700 'LEED Energy Performance Summary Report' by uploaded to LEED Online in lieu of the Section 1.4 tables spreadsheet?

A portion of our building envelope is historic. Can we exclude it from our model?

Which baseline HVAC system do I use if my building has no heating or air conditioning?

For an existing building, do I need to rotate the model?

Our project has a diesel backup generator. Should we include it in our energy model?

Our project has a large process load—75%. Despite our efforts to make an efficient HVAC design, the cost savings are minimal. What can we do to earn this prerequisite and be eligible for LEED certification? Is there any flexibility in how we model the p

Can SHGC be higher in the proposed than in the baseline model?

Our process load is higher than 25%. Do we have to justify that?

Do I need to justify the electrical and fuel rates I am using in my model?

Our local code references ASHRAE 90.1-2010. Should I use that for my documentation, or 90.1-2007?

Can I claim exterior lighting savings for canopy lighting even though a baseline model cannot include shading elements?

The project is built on a site with existing exterior lighting installed. How should this be accounted for?

Can mezzanines open to floors below be excluded from the energy model?

How do I provide a zip code for an international location?

View answers »

Forum discussion

NC-2009 EAp2:Minimum Energy Performance

DES Option 1 – Streamlined Path

As per DES – Performance path option 1, the DES has to be modeled as purchased energy in both baseline and proposed case energy models. For proposed model, the pumps which are downstream equipment within the LEED boundary shall be modeled with chilled water meter. So, how to model the pumps for purchased energy in baseline case?

0

You rely on LEEDuser. Can we rely on you?

LEEDuser is supported by our premium members, not by advertisers.

Go premium for $15.95  »

Thu, 12/29/2016 - 18:05

Identical to the proposed since those pumps are not regulated by 90.1-2007 without addenda. If you follow Addendum ai instead of DES Option 1 the Baseline pumps are defined there.

Fri, 12/30/2016 - 04:23

Thanks Marcus. So for projects which do not have pumps downstream, can we neglect the pumps energy consumption after modeling in base & proposed model.

Fri, 12/30/2016 - 15:03

You don't model the pumps at all if they are not downstream. You treat the chilled water as purchased energy which arrives under sufficient pressure to not require pumps.

Add new comment