Log in
Forum » CS-2009 IEQc3
Topic

Occupancy date for Core and Shell

CS-2009 IEQc3: Construction IAQ management plan - during construction
posted by Edgar Arevalo on Jul 3, 2019, 3:19 pm

Regarding the...

Extraction Monoxide in Basement During Construction

CS-2009 IEQc3: Construction IAQ management plan - during construction
posted by Alan Viale on Jan 20, 2015, 10:06 am

we have a project of 20 floors of offices; and has 10 parking basements by local regulations.
The design of parking in basements requires extraction monoxide.

Currently is under...

Last reply: Adrian Arenas, Mar 17, 2017, 3:09 pm

NO HVAC INSTALATION- C&S IEQ Credit 3.1

CS-2009 IEQc3: Construction IAQ management plan - during construction
posted by Gabriel Yurevich on Apr 28, 2015, 4:09 pm

Hi everybody. We are in the design phase of a CS small building certification. In which we dont project any HVAC installaction in scope. How can we create a...

Last reply: Tristan Roberts, Jan 19, 2017, 5:49 am

Plastic Sheeting to Protect Raised Technical Floor

CS-2009 IEQc3: Construction IAQ management plan - during construction
posted by Ian McCall on Jun 16, 2015, 10:17 am

Hello,
The installation contractors state that on previous LEED projects they have placed down plastic sheeting down in order to protect the raised technical floor. Correct me if I am wrong...

Last reply: Tristan Roberts, Jan 19, 2017, 5:48 am

Fan and Coil Units

CS-2009 IEQc3: Construction IAQ management plan - during construction
posted by Gabriela Hernández Castillo on Feb 15, 2012, 12:00 pm

Is there any...

Last reply: Ciaran McCabe, Nov 20, 2016, 3:55 pm

SMACNA Ductwork Protection Guidelines

CS-2009 IEQc3: Construction IAQ management plan - during construction
posted by Ciaran McCabe on Nov 8, 2016, 10:12 am

In order to qualify for this credit is it acceptable if the duct work is wrapped once it arrived on site OR should it arrive pre-wrapped. Is it acceptable if we wrap the duct work end in plastic...

Last reply: Michelle Halle Stern, Nov 8, 2016, 6:52 pm

Filter Replacement

CS-2009 IEQc3: Construction IAQ management plan - during construction
posted by Andrew Ellsworth on Dec 17, 2014, 10:13 pm

BACKGROUND: We have a project that is an office building pursuing LEED-CS 2009 certification. The C&S was substantially complete within the last several weeks. The tenant fitouts for about 2/...

Last reply: Michelle Halle Stern, Dec 18, 2014, 11:42 am

EXTRACTION DUCTS AND FANS

CS-2009 IEQc3: Construction IAQ management plan - during construction
posted by Michael E. Edmonds-Bauer on Apr 2, 2013, 5:44 pm

This might sound obvious, but we wanted to double check.

Regarding underground parking encloused parking (no natural ventilation at all), there always will be fans to "push" the air...

Last reply: Tristan Roberts, Nov 4, 2013, 12:59 pm

Scheduling of Building Flush out for LEED Core and Shell Project

CS-2009 IEQc3: Construction IAQ management plan - during construction
posted by Sangmin An on Jul 19, 2013, 1:16 am

Hello,
I have a few questions in connection with SCHEDULING of...

Last reply: Tristan Roberts, Nov 4, 2013, 12:58 pm

ID credit for flushout under other rating systems guidelines?

CS-2009 IEQc3: Construction IAQ management plan - during construction
posted by Deeta Bernstein on Jul 17, 2013, 1:39 pm

Does anyone have experience documenting an ID credit in CS for flushout based on another rating system (CI for example)? Flushout would be just for built out 2 floors of a 5 story building.

Last reply: Deeta Bernstein, Jul 17, 2013, 8:31 pm