Topic | Recent |
---|---|
Ds valueCS-2009 IEQp1: Minimum indoor air quality performanceposted by Gustavo De las Heras Izquierdo on Sep 2, 2016, 2:03 pm
Hi all! Last reply: Dylan Connelly, Jan 23, 2017, 10:01 am |
|
Two buildings on one project siteCS-2009 IEQp1: Minimum indoor air quality performanceposted by James Lee on Oct 28, 2016, 3:34 pm
Hi, I am James and am working on project with two buildings on one project site. Maybe someone already asked... Last reply: Tristan Roberts, Jan 18, 2017, 12:40 am |
|
Ds of VAVCS-2009 IEQp1: Minimum indoor air quality performanceposted by Cathy W on Aug 31, 2016, 7:23 am
The Ds is determined by dividing the minimum... Last reply: Dave Hubka, Aug 31, 2016, 4:08 pm |
|
IEQp1 online form- potential errorCS-2009 IEQp1: Minimum indoor air quality performanceposted by Scott McMillan on Aug 25, 2016, 11:28 pm
We are at Design Appeal stage on a core and shell office project - we have been asked to recalculate ASHRAE 62 compliance based on a theoretical office floor layout incorporating meeting rooms,... Last reply: Charalampos Giannikopoulos, Aug 26, 2016, 3:12 am |
|
Default occupancy counts (ASHRAE 62.1 vs. Reference Guide)CS-2009 IEQp1: Minimum indoor air quality performanceposted by Ricardo Sá on Aug 3, 2015, 4:57 am
According to LEED Reference Guide (C&S Box in page 410), Core & Shell Projects that do not have occupancy counts must use the default occupancy densities provided in ASHRAE 62.1 (table 6.... Last reply: Michael Brown, Jul 22, 2016, 11:02 am |
|
Ventilation strategy for rooms added after construction workCS-2009 IEQp1: Minimum indoor air quality performanceposted by Ricardo Sá on Aug 3, 2015, 4:50 am
An office building that is being certified under LEED C&S will have 80% of its... Last reply: Michael Brown, Jul 22, 2016, 9:54 am |
|
Untenanted spaces with no lease agreementsCS-2009 IEQp1: Minimum indoor air quality performanceposted by John Mader on Jun 29, 2016, 3:53 am
We have a question about retail tenant spaces inside an office building. The owner will provide the retail spaces as cold shells for the retail tenants to fit out after the building is complete.... Last reply: John Mader, Jul 4, 2016, 10:55 pm |
|
Confidential lease agreements cannot be obtainedCS-2009 IEQp1: Minimum indoor air quality performanceposted by John Mader on Jun 29, 2016, 3:50 am
Our project is an office building with some retail spaces on its lower floors that have already been leased. We are pursuing LEED CS v2009 and have made the first Design Submission and are now... |
|
Minimum ventilation requirement for UPS/Server RoomCS-2009 IEQp1: Minimum indoor air quality performanceposted by J I on Jan 6, 2014, 1:22 pm
Is there any minimum ventilation requirement for the server/UPS room in compliance with 62.1-2007? Last reply: Ciaran McCabe, May 27, 2016, 4:52 am |
|
Background VentilationCS-2009 IEQp1: Minimum indoor air quality performanceposted by Francis McNulty on Apr 1, 2016, 5:58 am
Hi Everybody, |