Forum » CS-2009 MRp1
Topic

Area for collection of recyclables on Campus certification

CS-2009 MRp1: Storage and Collection of Recyclables
posted by Victoria Rios Esteve on Dec 23, 2019, 2:42 pm

Hi everyone,

We are close to certify a Core and Shell project as Campus. We have the following doubt: is it necessary to have an specific area for storing and collecting recyclables for...

2 rooms

CS-2009 MRp1: Storage and Collection of Recyclables
posted by gabriel Morales on Feb 11, 2014, 1:22 pm

Hi, in our project we have reduced the complexity of the land areas, this has affected garbage have 2 rooms on the same level with easy vehicular access for trash removal.

Our question is...

Last reply: Jeanabelle Gardon, Aug 22, 2019, 8:24 am

Material Recovery Facility- Requirement Area

CS-2009 MRp1: Storage and Collection of Recyclables
posted by John Raymond Dimailig on Feb 12, 2018, 1:01 am

Hi Ma'am/Sir,

Our project has three towers and shares one podium. There are three proposed recycling areas but too small to comply the leed requirement. But if the areas were sum up, it...

Trouble finding comparable projects for recycling rates

CS-2009 MRp1: Storage and Collection of Recyclables
posted by Martin Stowell on Jun 10, 2016, 2:04 pm

I am working on a C&S project and I am trying to figure out the expected volume of recycling for the building. I've contacted local waste haulers but is there somewhere else that i can find...

Last reply: Steve Loppnow, Jan 20, 2017, 3:12 pm

Expected Waste Volume

CS-2009 MRp1: Storage and Collection of Recyclables
posted by Saud Abdul Rasheed on Oct 24, 2015, 8:02 am

Hi all,
Our project is a commercial tower mainly with offices and few retail shops. The total area is 272,500 sq. ft. and we have provided waste collection area of 620 sq. ft. in the...

Last reply: Saud Abdul Rasheed, Dec 30, 2015, 10:45 pm

Extraction system for storage area

CS-2009 MRp1: Storage and Collection of Recyclables
posted by Luis Miguel Diazgranados on Nov 27, 2014, 11:53 am

Project location: Outside Bogotá, Colombia
I am currently working on a CS project (a warehouse more specifically) located in a suburban region, near Bogotá-Colombia, called Tocancipá. The...

Last reply: Megan White, Dec 30, 2015, 2:21 pm

Recycling rooms to suit tenant fitout needs

CS-2009 MRp1: Storage and Collection of Recyclables
posted by Larry Jones on May 14, 2014, 6:05 pm

We are working on an office CS project which is being built to suit for a single tenant. The tenant will fit out the core and shell with a LEED-CI project that is being designed concurrently...

Last reply: Megan White, Dec 30, 2015, 2:16 pm

Area allocated for recyclables

CS-2009 MRp1: Storage and Collection of Recyclables
posted by Devanand Ragbir on Jul 7, 2015, 2:14 pm

Reference calculation is based on 'sqft of the building' .
Does the sqft of the building will have to include the parking area also(example basement parking)

Last reply: Jon Clifford, Jul 7, 2015, 10:06 pm

Molok Containers for MRp1

CS-2009 MRp1: Storage and Collection of Recyclables
posted by Kristopher Lashley on Oct 17, 2014, 1:28 pm

We are looking to install a 5000L Molok recycling bin for a LEED 2009 CS building that will be a restaurant. According to the reference guide a 11.6m recycling area would be required. However we...

Last reply: Deborah Lucking, May 18, 2015, 4:12 pm

Cold, dark warehouse, round 3 (at least)

CS-2009 MRp1: Storage and Collection of Recyclables
posted by Tiffany Moore on Feb 13, 2014, 5:43 pm

I just received review comments back on MRp1 that I simply can't validate. I'd appreciate any help or advice that might be out there. Otherwise, I think I'm going to champion this one and push...

Last reply: Michelle Rosenberger, Feb 13, 2014, 6:41 pm