Topic | Recent |
---|---|
Baseline System for Warehouse ShellCS-2009 EAp2: Minimum Energy Performanceposted by Tony Schafer on Aug 14, 2012, 6:04 pm
Wondering how to determine the baseline system for a warehouse that upon initial completion will be a cold, dark shell maintained at 50°F. For EAp2 we are assuming 10% office space for the future... Last reply: Tony Schafer, Aug 15, 2012, 1:31 pm |
|
High Hazard Areas for Core & ShellCS-2009 EAp2: Minimum Energy Performanceposted by Michael Trzcinski on Aug 14, 2012, 3:33 pm
We are working on a warehouse building with attached offices in climate zone 5A, with gas-fired rooftop equipment for heating. Per Table G3.1.1, the baseline system should be system type 5, but a... Last reply: Marcus Sheffer, Aug 14, 2012, 5:52 pm |
|
Sort chiller heat pump in ASHRAE 90.1-2007CS-2009 EAp2: Minimum Energy Performanceposted by Diego Escalona on Aug 2, 2012, 11:56 am
Hello all, I'm participating in a project of a building of 20 floors of offices, of which the first corresponds to shops and entrance hall. There are approximately 30000 m² conditioned by... Last reply: Diego Escalona, Aug 14, 2012, 5:18 pm |
|
Natural VentilationCS-2009 EAp2: Minimum Energy Performanceposted by Luana Bertoletti on Aug 14, 2012, 8:06 am
Hi! Currently, I'm working on a warehouse's project under LEED certification. There's no heating/cooling system in the warehouses, there's only natural ventilation. Last reply: Luana Bertoletti, Aug 14, 2012, 9:02 am |
|
chiller reference values for energy modeling and compliance formCS-2009 EAp2: Minimum Energy Performanceposted by Adam Targowski on Aug 8, 2012, 7:28 am
I am working on a project which is equipped with air-cooled chillers. According to ASHRAE 90.1-2007, Appendix G, table G3.1.3.7. I was required to use water-cooled chiller in the referece energy... Last reply: Marcus Sheffer, Aug 8, 2012, 9:28 am |
|
ASHRAE 90.1 Exit signs- Mandatory ProvisionsCS-2009 EAp2: Minimum Energy Performanceposted by Bernadette Stauder-Buschlinger on Jun 26, 2012, 11:58 am
In the CS- project the exit signs are considered to be a part of the... Last reply: Martin Elezovic, Jul 28, 2012, 3:03 am |
|
Automatic Lighting Shutoff for tenant spacesCS-2009 EAp2: Minimum Energy Performanceposted by Katherine Ann Resurreccion on Jul 4, 2012, 7:27 pm
Do tenant spaces need to be included in the areas controlled by the automatic shutoff as mentiaoned in section 9.4.1.1 (ASHRAE 90.1)? Last reply: Marcus Sheffer, Jul 26, 2012, 12:26 pm |
|
Lighting power densities for building exteriorsCS-2009 EAp2: Minimum Energy Performanceposted by Rosana Correa on Jul 26, 2012, 11:12 am
The maximum power allowance for building façades is 2.2 W/m2 for each illuminated wall or surface. If I have two façades, one of them below 2.2W/m2, and the other above this limit, can I... Last reply: Marcus Sheffer, Jul 26, 2012, 12:24 pm |
|
Continuous InsulationCS-2009 EAp2: Minimum Energy Performanceposted by Tony Schafer on Jul 2, 2012, 11:57 am
I am trying to use Table A3.3 to determine the overall wall... Last reply: Marcus Sheffer, Jul 26, 2012, 11:41 am |
|
Baseline HVAC System for laboratoryCS-2009 EAp2: Minimum Energy Performanceposted by Yu Wang on Jun 20, 2012, 5:37 am
I am not clear about explanation from ASHRAE 90.1-2007 User’s Manual: Last reply: Yu Wang, Jul 19, 2012, 3:52 am |