Forum » CI-2009 IEQc6.1
Topic

Difference between Multiple Circuit-On/Off and Multiple mode

CI-2009 IEQc6.1: Controllability of systems - lighting
posted by Felipe Duran on Aug 10, 2012, 12:44 pm

I am having trouble translating these systems. Can anyone explain the difference between these 2 control types?
Thank you

Last reply: Kanav Vij, Dec 17, 2020, 12:28 pm

90% controls for open office systems furniture

CI-2009 IEQc6.1: Controllability of systems - lighting
posted by Brian VanAllen on May 27, 2015, 10:45 am

As the electrical design engineer; what is an acceptable means for me to meet the 90% controllability requirement on my drawings- for open offices? Please keep in mind this is for an open space...

Bank tellers need tasklighting?

CI-2009 IEQc6.1: Controllability of systems - lighting
posted by Saju Varghese on Jul 22, 2013, 6:33 pm

Would bank teller stations need tasklighting (or are they considered workstations) for the purpose of this credit?

Last reply: Lauren Sparandara, Jun 11, 2014, 3:19 pm

IEQ 6.1 Task Lighting

CI-2009 IEQc6.1: Controllability of systems - lighting
posted by Samuel Nation on Feb 6, 2014, 11:54 am

The owner has committed to providing desk lamps to open office areas to meet individual control at work stations. The work stations however, are not officially part of the project. They will...

Last reply: Lauren Sparandara, Jun 11, 2014, 3:19 pm

Solar Powered Task Lighting

CI-2009 IEQc6.1: Controllability of systems - lighting
posted by Chris Brown on Jun 11, 2014, 6:52 am

Would Solar powered task lighting be acceptable for individual workstations in order to comply with this credit?

Last reply: Lauren Sparandara, Jun 11, 2014, 3:16 pm

Latest Minimum Requirements for IEQc6.1

CI-2009 IEQc6.1: Controllability of systems - lighting
posted by Kathy Wislocky on Jun 11, 2013, 7:30 pm

I see a few posts discussing the minimum requirements for both private offices and shared multi-occupant spaces, but some discussions are older and I'm wondering if LEED reviewer expectations or...

Last reply: Kathy Wislocky, Jun 11, 2013, 8:08 pm

Informal Meeting Spaces

CI-2009 IEQc6.1: Controllability of systems - lighting
posted by William Weaver on Sep 18, 2012, 11:50 am

Intermixed throughout our open office floor plan, we have included a number of casual seating arrangements to facilitate informal, impromptu meetings. Would these informal seating arrangements...

Last reply: David Posada, Sep 21, 2012, 3:02 pm

Task Lighting

CI-2009 IEQc6.1: Controllability of systems - lighting
posted by Dominique Arrieta on Jul 12, 2012, 5:31 pm

We have been denied IEQc7.1 due to not showing task lighting at each individual workstation. The reason for this is that we have treated the open spaces that include cubicles/ student...

Last reply: Lauren Sparandara, Sep 5, 2012, 8:50 pm

Occupancy sensors: valid lighting control?

CI-2009 IEQc6.1: Controllability of systems - lighting
posted by Amanda Redmond-Neal on Aug 17, 2011, 1:27 pm

I have an individually occupied "office" (kind of like a coat-check, really) that for some reason was built with only an occupancy sensor and no wall switch. Does the occupancy sensor count as a...

Last reply: Lauren Sparandara, Jul 26, 2012, 8:39 pm

Controls for open-floor plan

CI-2009 IEQc6.1: Controllability of systems - lighting
posted by Diana Nezamutinova on Dec 6, 2011, 6:33 am

Our project is following CI-2009 guidelines. What lighting controls would be sufficient for offices with open floor plans? Could a "cluster" (an "island") of 6 tables linked together be...

Last reply: Lauren Sparandara, Dec 16, 2011, 2:37 pm