Log in
Forum » CI-2009 IEQc5
Topic

Entryway System on 22nd Floor

CI-2009 IEQc5: Indoor Chemical and Pollutant Source Control
posted by Lisa Granger on Jan 11, 2017, 12:04 pm

We are going for IEQ Credit 5 under LEED 2009 CI. The project is on the 22nd floor of a building where there is a significant amount of...

Last reply: Michael Smithing, Jan 11, 2017, 9:14 pm

Permanent entry way to retail space in a mid-rise multi-family

CI-2009 IEQc5: Indoor Chemical and Pollutant Source Control
posted by Morteza Kasmaei on Oct 17, 2016, 11:39 am

This is an eight-story apartment building that is pursuing LEED-NC 2009 and contains future retail spaces in the ground floor. In order to achieve this credit are the future retail tenants...

Last reply: Michelle Halle Stern, Oct 17, 2016, 1:29 pm

Walk-off Mat Width Requirement

CI-2009 IEQc5: Indoor Chemical and Pollutant Source Control
posted by Itzel Meynard on Oct 4, 2016, 1:42 pm

My project is LEED 2009 commercial interiors. I understand the entryways are required to be 10 feet in the direction of travel inside the building. Is there any requirements about the width of an...

Last reply: Michelle Halle Stern, Oct 5, 2016, 11:07 am

ID credit Green Cleaning Policy without walk-off mats

CI-2009 IEQc5: Indoor Chemical and Pollutant Source Control
posted by Rachel Bannon-Godfrey on Aug 4, 2016, 12:17 am

We have a project that is not achieving IEQc5 as walk-off mats conflict with the operational aspects of the building. Can we still apply for an ID credit for a green cleaning policy?

Last reply: Michelle Halle Stern, Aug 4, 2016, 6:30 am

Dedicated Exhaust Clarification

CI-2009 IEQc5: Indoor Chemical and Pollutant Source Control
posted by Alana Spencer on Jul 28, 2016, 2:32 pm

Hello,

Could the exhaust of a high-...

Last reply: Dylan Connelly, Jul 31, 2016, 3:13 pm

printing room in an open office

CI-2009 IEQc5: Indoor Chemical and Pollutant Source Control
posted by ANNA SUN on Mar 17, 2016, 5:43 am

a small printing room in an open office, no...

Last reply: Allison Beer McKenzie, Mar 17, 2016, 9:45 am

'..with no air recirculation' is for exhaust system or AC system

CI-2009 IEQc5: Indoor Chemical and Pollutant Source Control
posted by Qiao LIANG on Jan 14, 2016, 3:54 am

LEED v3 reference guide has mentioned that 'the exhaust rate must be at least 0.5 cfm per square foot, with no air recirculation'..does it mean exhaust system or AC system??? If for AC system,...

Last reply: Qiao LIANG, Mar 14, 2016, 9:56 am

Walk off mat length within vestibule

CI-2009 IEQc5: Indoor Chemical and Pollutant Source Control
posted by Maria Papiez on Jan 6, 2016, 9:14 pm

Have there been any exceptions to the walk-off mat length requirement when vestibules are located at an exterior entry? Our project is designed to have 8 feet of length within a vestibule, and...

Last reply: Maria Papiez, Jan 7, 2016, 12:28 pm

Enter way/Filling out the Form

CI-2009 IEQc5: Indoor Chemical and Pollutant Source Control
posted by Bridgett Weaver on Apr 27, 2015, 12:54 pm

Working on a project that the occupancy of the building is a multi-tenant. Would the project still be able to receive this credit, if the entryway / walk off mats are not apart of the project...

Last reply: Michelle Halle Stern, Apr 30, 2015, 10:50 am

Exhaust fan for chemical storage

CI-2009 IEQc5: Indoor Chemical and Pollutant Source Control
posted by Yaser Al Sharif on Apr 13, 2015, 8:03 am

If We have chemical storage room with 69.4 ft square in Area in our building , i want to install one exhaust fan for this room to acheive credit requirements , how can i calculate minimum...

Last reply: Michelle Halle Stern, Apr 13, 2015, 10:58 am