about the draws in 8.1 and 8.2
CS-2009 IEQc8.1:Daylight and views - daylightposted by Shenhao Li on
Hello i am working on IEQ 8.1 and 8.2, I use simulation methods in 8.1. my question is that can i use diffrient draws in two credit?
output summary
CS-2009 IEQc8.1:Daylight and views - daylightposted by Shenhao Li on
In the form, I need Provide an output summary from the daylight computer simulations. does it exist a template to do it? if not, does it need which information in the reports?
Construction Submittal
NC-2009 SSc4.2:Alternative transportation - bicycle storage and changing roomsposted by Jennifer Benedict on
Is there any additional items that are required during the construction submittal?
Simultaneity factor flushing of toilets and landscape
NC-2009 WEp1:Water use reductionposted by Lise Dannesboe on
Hej! We are integrating a water tank in our project to supply the toilets with rainwater and to supply landscaping with water.
What was your LEED deliverable after the site assessment?
Healthcare-v2009 SSp2:Environmental site assessmentposted by Jill DeMarotta on
What have you provided as a deliverable for this credit? Was it the EPA's Ready for Reuse form? Our inspecting authority is not sure what to provide to appease the LEED reviewer. Thanks-
Conditioned vs. unconditioned & natural ventilation
NC-2009 EAc1:Optimize energy performanceposted by SmithGroup BG+LU FW on
Table G3.1 in Appendix G requires only conditioned space be simulated as being both heated and cooled in the proposed design.
Option 2 - portion of residential street meets 10 units per acre
NC-2009 SSc2:Development density and community connectivityposted by Jay DeVilbiss on
Hello, I have a question regarding the requirement for a residential neighbourhood meeting a min density of 10 units per acre for Option 2 - Community Connectivity.
dorm bike storage
NC-2009 SSc4.2:Alternative transportation - bicycle storage and changing roomsposted by Brian Wolfe on
Is it acceptable to pursue bike storage on the premise that the secured, covered storage is the dorm/apartment.
pre-rinse spray faucet
NC-2009 WEp1:Water use reductionposted by Sheryl Swartzle on
Working on my 1st project that includes a pre-rinse spray faucet for a restaurant/cafe type setting. What should should be shown as the total daily uses and the duration on the template?
Do you submit form during Design or Construction Review phase?
NC-2009 EAp1:Fundamental commissioning of building energy systemsposted by Nicole Kimoto on
For the EAp1 form, I'm confused as to whether I am supposed to fill out this form for the design preliminary review, because this is a Construction credit? Can someone please clarify?