about the draws in 8.1 and 8.2

CS-2009 IEQc8.1:Daylight and views - daylight
posted by  Shenhao Li  on 

Hello i am working on IEQ 8.1 and 8.2, I use simulation methods in 8.1. my question is that can i use diffrient draws in two credit?

1
Tue Aug 13, 2013, 12:52 pm

output summary

CS-2009 IEQc8.1:Daylight and views - daylight
posted by  Shenhao Li  on 

In the form, I need Provide an output summary from the daylight computer simulations. does it exist a template to do it? if not, does it need which information in the reports?

1
Tue Aug 13, 2013, 12:45 pm

Construction Submittal

NC-2009 SSc4.2:Alternative transportation - bicycle storage and changing rooms
posted by  Jennifer Benedict  on 

Is there any additional items that are required during the construction submittal?

1
Wed Aug 14, 2013, 6:17 pm

Simultaneity factor flushing of toilets and landscape

NC-2009 WEp1:Water use reduction
posted by  Lise Dannesboe  on 

Hej! We are integrating a water tank in our project to supply the toilets with rainwater and to supply landscaping with water.

1
Sun Nov 3, 2013, 7:11 pm

What was your LEED deliverable after the site assessment?

Healthcare-v2009 SSp2:Environmental site assessment
posted by  Jill DeMarotta  on 

What have you provided as a deliverable for this credit? Was it the EPA's Ready for Reuse form? Our inspecting authority is not sure what to provide to appease the LEED reviewer. Thanks-

0

Conditioned vs. unconditioned & natural ventilation

NC-2009 EAc1:Optimize energy performance
posted by  SmithGroup BG+LU FW  on 

Table G3.1 in Appendix G requires only conditioned space be simulated as being both heated and cooled in the proposed design.

1
Fri Aug 16, 2013, 1:02 pm

Option 2 - portion of residential street meets 10 units per acre

NC-2009 SSc2:Development density and community connectivity
posted by  Jay DeVilbiss  on 

Hello, I have a question regarding the requirement for a residential neighbourhood meeting a min density of 10 units per acre for Option 2 - Community Connectivity.

1
Fri Aug 16, 2013, 9:02 pm

dorm bike storage

NC-2009 SSc4.2:Alternative transportation - bicycle storage and changing rooms
posted by  Brian Wolfe  on 

Is it acceptable to pursue bike storage on the premise that the secured, covered storage is the dorm/apartment.

1
Wed Aug 14, 2013, 6:07 pm

pre-rinse spray faucet

NC-2009 WEp1:Water use reduction
posted by  Sheryl Swartzle  on 

Working on my 1st project that includes a pre-rinse spray faucet for a restaurant/cafe type setting. What should should be shown as the total daily uses and the duration on the template?

1
Wed Aug 14, 2013, 6:51 pm

Do you submit form during Design or Construction Review phase?

NC-2009 EAp1:Fundamental commissioning of building energy systems
posted by  Nicole Kimoto  on 

For the EAp1 form, I'm confused as to whether I am supposed to fill out this form for the design preliminary review, because this is a Construction credit? Can someone please clarify?

1
Wed Aug 14, 2013, 9:11 pm