Forum quick links
Precertification Before Master Site Registration
posted by Omer Moltay on
Dear All, In a single site there will be two buildings and we wish to implement the Master Site for their LEED certification.
Campus possiblity
posted by Helena Garcia on
Hello LEEDusers!
Mastesite with deferred tower
posted by Kristen Gomez on
Dear All,
Documenting Master Site Credits
posted by Deborah Lucking on
I got this below from the LEED Help Center, which I find really confusing, and does not accord with the current LEED Online for Campus/Master Site format.
3 buildings that connected via link-bridge
posted by Michael Wahjudi on
Hi all. Wanted to seek your comments on consideration of our developments as "single building" so it can fit into one LEED certification.
Master Site with three projects possibly a fourth
posted by Lou Niles II on
Hello I am looking for guidance or experience in a phased construction on a Master Site. I have a Master Site in southern California has three Core & Shell projects on it.
LEED v4 ID&C Individual or Campus or Group?
posted by Erin Rowe on
Hi - I'm working with a "campus" project with two buildings on the same site, same construction timeline, same design.
LEED ND GIB Credit for District Heating and Cooling
posted by nathan jame on
Hi, refers to the ND GIB for district heating and cooling, it says "Each system component that is addressed by ANSI/ASHRAE/IESNA Standard 90.1–2010 must have an overall efficiency performance at le
LEED Campus - About claiming campus credit under individual building certification
posted by Aymeric Novel on
Dear LEEDUser community,