Forum quick links
Cumulative Points
Pilot-Credits WEpc115:Whole Project Water Use Reductionposted by Catarina Costa Goncalves on
Can we still target this credit even if we do not get full points under indoor water use reduction credit?
Attempting Indoor Water Use Reduction Credit using minimal plumbing fixtures that serve occupants outside of the project space
CI-v4 WEc1:Indoor water use reductionposted by Edgar Arevalo on
I seem to have a unique problem. My project is a lab/office space that is occupying half of a floor in a building.
INpc 137 Safety First: Cleaning your space for emerging pathogens
NC-v4 INc1:Innovationposted by Glen Boldt on
What are some other testing strips that are readily available to test the cleanliness of a surface?
Overall credit experience
Pilot-Credits EQpc116:Daylight in nonregularly occupied spacesposted by Valeria Fiorentino on
As the project was already pursuing Daylight credit we have been able to use the same simulation tool for this piot credit.
water leak detection pilot credit?
CS-v4 WEp2:Indoor water use reductionposted by Sareet Benayahu on
Hi all,
Occupant usage of tenant fixtures is less than 100%
CI-v4 WEp1:Indoor water use reductionposted by Nadia Azzam on
We are working on a tenant fit-out for a specialty group occupying the entire 3rd floor and part of the 1st floor in a LEED-certified building.
Interiors Life-Cycle Impact Reduction - Option 3 Design for Flexibility
CI-v4.1 MRc2:Interiors Life-Cycle Impact Reductionposted by Laura Riegle on
Hi,
I am persuing the "Interiors Life-Cycle Impact Reduction" credit, Option 3: Design for Flexibility for a CI project.
Data Center LPD
Data-Centers-NC-v4 EAp2:Minimum energy performanceposted by David Edenburn on
When we use the S-by-S method we have problems with some rooms being over-lighted. On average, we are pretty good.
Zero Lot Line with required streetscape
NC-v4.1 MPR2:Must use reasonable LEED boundariesposted by Elena Khoury on
Can streetscape can be excluded from a project boundary if it's required by municipality?