According to ASHRAE 90.1-2010 Table G3.1.5 (f) for existing building envelopes, the baseline building design shall reflect existing conditions prior to any revisions that are part of the scope of work being evaluated.
Does this mean that for an existing building that concern a project that is major renovation the baseline envelope have to be constructed in conjunction with this paragraph of Table G3.1.5 (f) and not Table G3.1.5 (a) until Table G3.1.5 (e)