Forum quick links
Native plants = No Irrigation Required?
NC-v4 WEc1:Outdoor water use reductionposted by Yoyo Shek on
Hi All,
Noted in the Step-by-Step Guidance, Step 2. Option 1. saying that:
Calculations or descriptions
NC-2009 EAc5:Measurement and Verificationposted by Barbara Aguirre Garcia on
For credit, is it necessary to make calculations within the plan, regarding the baseline calculation, the reporting period? Or is it just describing the elements to do the calculations?
Legal Wood Pilot Credit and MR BPDO Sourcing of Raw Materials / Alternate Compliance Path
CI-v4.1 IN101:Innovationposted by John Masters on
Need some direction regarding the Legal Wood Pilot Credit & ACP - MR BPDO Sourcing Raw Materials
LEED O&M Starter Kit and Pilot Credit Safety First: Cleaning and Disinfecting Your Space
NC-v4 INc1:Innovationposted by James Keohane on
Is it acceptable to for a LEED v4 BD+C: NC project to seek BOTH innovation point for LEED O&M Starter Kit and a Pilot Credit INPC 137- Safety First: Cleaning and Disinfecting Y
Green Infrastructure and Buildings: What should be rating system for the chosen building?
ND-Plan-v4 GIBp1:Certified green buildingposted by Marine Petrosyan on
Hi, All!
Proposed Design Demand Control Ventilation
CI-v4 EAp2:Minimum energy performanceposted by Luis Andrade on
Hi all,
Historic Building Major Renovation - compliance with prescriptive Insulation and Air Barrier Requirements
Mid-Rise-v4 EAp1:Minimum energy performanceposted by Colin Rohlfing on
Hello, there is a 160,000 SF historic building that will be doing a gut-rehab and has a masonry (brick) exterior that can't be altered.
Skylights in Warehourse
Warehouses-NC-v4 SSc6:Light pollution reductionposted by Anna Korinkova on
Hello,
As of LEED v4 Indoor lighting pollution is a part of Minimum Energy performance credit.
Measuring TVOCs
EBOM-v4.1 EQp4:Indoor Environmental Quality Performanceposted by Rick Alfandre on
Has anyone ever used a device called the Airthings Wave Plus? We want to use it to report CO2 and TVOC numbers, but it reports TVOC's in ppb not ug/m3.
Framed assembly U-value calculation
NC-v4 EAc2:Optimize energy performanceposted by Sarah Leenknegt on
Hi