Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Permeable Paving - "vegetated open space"

NC-2009 SSc5.2:Site Development—Maximize Open Space
posted by  Lauren Sparandara  on 

If our permeable paving has grass growing through it could that count as both hardscape for SSc7.1 and for vegetated open space in SSc5.2?

6
Default Avatar
LEED BD+C O+M
Carde Ten Architects
LEEDuser Basic Member
74 thumbs up
Wed Jun 26, 2024, 2:13 am
2
ESG consultant, LEED AP BD+C
Self Employed
LEEDuser Basic Member
36 thumbs up
Tue Jun 25, 2024, 7:27 pm

Building Product Disclosure and Optimization required documentation

NC-v4.1 MRc4:Material Ingredients
posted by  Marcelo Alencar Pereira  on 

Do I need to submit the purchase invoice or any other documentation confirming product acquisition when applying for Building Product Disclosure and Optimization credits on LEED Online?

1
Fri Jun 28, 2024, 1:48 pm

Reduced Runoff/Rate of Runoff for existing site

NC-2009 SSc6.1:Stormwater Design—Quantity Control
posted by  R.L. Bowen  on 

Our premilimary review comments for V2009 noted that "Reduction in quantity (SSc6.1) will require stormwater to be infiltrates or re-used onsite.

0

Purple Roof

NC-v4 SSc5:Heat island reduction
posted by  Edgar Arevalo  on 

Has anyone encountered a project where the client or other circumstances suggested we look into purple roof solution.  From the looks of it, it's a green roof solution with optimized stormwate

2
ESG consultant, LEED AP BD+C
Self Employed
LEEDuser Basic Member
36 thumbs up
Sun Jun 23, 2024, 11:50 pm

Entryway system

CI-v4 EQc1:Enhanced indoor air quality strategies
posted by  RAMON CHRISTOPHER MEDRANO  on 

I have a office space project, that will have an entryway system (walk off matt).

4
Sun Jun 23, 2024, 10:02 am
4
Sat Jun 22, 2024, 9:03 pm

Minimum Program Requirements - Must use a reasonable site boundary: site + building

NC-v4 MPR2:Must use reasonable LEED boundaries
posted by  Theresa Lehman  on 

This is a complex, multi-part question. An airport project is being phased and has multiple contracts. The scope includes replacing the runways and concrete around the terminals.

1
Fri Jun 21, 2024, 3:29 pm
3
Sustainability Consultant
WSP
LEEDuser Expert
0 thumbs up
Fri Jun 21, 2024, 2:42 pm

LEED PC 66 Community Contaminant Prevention

Pilot-Credits EApc66:Community contaminant prevention - airborne releases
posted by  Amanda Brathwaite  on 

There are some applications, such as LPG (liquid petroleum gas) or diesel-fueled systems in remote locations, where you need to utilize combustion devices (stationary engines, boilers, etc) that do

5
Fri Jun 21, 2024, 2:34 pm