Forum quick links
BIFMA e3 equivalents
CI-v4 EQc2:Low emitting materialsposted by Samantha Allen on
Does anyone know of any equivalents for BIFMA e3 or level that are available in Europe?
BIFMA e3 Level equivalents in APAC and Europe
CI-v4 EQc2:Low emitting materialsposted by Tracy Backus on
Are BIFMA e3 level certificates for products recognized as viable certificates outside of NAM? What is the equivalent for APAC and also Europe? I have been referencing the EU Ecolabel i
Domestic Water Booster Pump Energy in LEED
NC-v4 EAp2:Minimum energy performanceposted by Moses Chong on
Has anyone successfully claim energy saving with domestic water booster pump? These pumps are often huge and there're no diversity profiles that I know of.
Can MEP CxA be more than 1 person?
NC-v4 EAc1:Enhanced commissioningposted by Michael on
Hi LEED Experts, I would like to ask: Is it a must to have only 1 key CxA person who will sign all the MEP functional testings?
Heat Island Mitigation with Cool Walls
CS-v4.1 INc1:Innovationposted by Carlos De Leon on
Hello LEED community!
Heat Island Mitigation with Cool Walls
CS-v4.1 INc1:Innovationposted by Carlos De Leon on
Hello LEED users!
IPpc90 Social Equity within the Project Team
Pilot-Credits IPpc90:Social equity within the operations and maintenance staffposted by Alison Kerr on
IPpc90 in LEED Online, v4, BD+C, NCMR is "Social equity within the project team." Not "...the operations and maintenance staff." My comment is regarding the Project Team Pilot credit.
Rainwater Management - No discharge at all or No immediate discharge?
NC-v4 SSc4:Rainwater managementposted by Junru Shen on
Hi All,
Documentation needed for a renovation project
NC-v4 EAc3:Advanced energy meteringposted by Audrey LEDESERT on
Hi,
I'm working on a renovation project, in Core & Shell. Concerning the different meters, some of them are existing meters.