On-site or off-site separation
Homes-v4 MRc3:Construction waste managementposted by Amrit Kaur on
The credit general requirement requires a percentage of material recycled, and a formal report indicating how much was recycled and to what purpose.
Logging requirement for 5 years
EBOM-v4 WEc4:Water meteringposted by Bo White on
What are the requirements for the 5 years of logging in terms of data and in terms of logging interval?
Option 2 - Excluding Demo
NC-v4 MRc5:Construction and demolition waste managementposted by Nathan Gauthier on
The credit language says "do not generate more than 2.5 pounds of construction waste..." but the example Equation 2 shows "Total construction AND DEMOLITION waste generated..." Has anybody clarifie
Option 2 - Based on GSF, excluding garage area but including garage CDW?
NC-v4 MRc5:Construction and demolition waste managementposted by Michelle Bombeck on
It appears that the for Option 2, teams must calculate the total waste generated for the project which might include construction of a garage or other site feature that would not be included in the
Lighting Controls - ASHRAE 90.1
NC-v4 EAp2:Minimum energy performanceposted by Esteban Martinez on
Hello
Energy building simulation
NC-v4 EAp2:Minimum energy performanceposted by Tarek on
I took the decision to be a LEED consultant, especially in Energy simulation. so what are the requirements for the LEED certification, qualifications, minimum experience, which program is needed?.
sending back material to Mfgr that was manufactured wrong size, etc.
NC-2009 MRc2:Construction waste managementposted by Debra A. Lombard on
Hello,
Does anyone know how USGBC reviewers would want this handled for C&D waste credit?
How does EPA Method 24 compare to CDPH Standard Method v1.1-2010?
NC-v4 EQc2:Low-emitting materialsposted by Summer Gorder on
We finally found a Static Control Epoxy Coating for a concrete floor that meets the VOC requirement, although it only References EPA Method 24.