Waste generated outside LEED boundary
NC-v4 MRc5:Construction and demolition waste managementposted by Cindy Quinn on
Does anyone have experience with construction waste generated outside of a project's LEED boundary? We have project that is owned by the city, who is also the waste hauler. The city is
Can the Project Management Consultant (PMC) act as the LEED Commissioning Authority (CxA)?
NC-v4.1 EAc1:Enhanced Commissioningposted by Hameed Jasir on
Hello everyone,
I would like to clarify a scenario related to the CxA eligibility requirements for LEED v4.1 Fundamental and Enhanced Commissioning.
University Campus - Area outside LPB designated as "preserved and protected" greenfield or restored area allowed?
NC-v4 SSc2:Site development - protect or restore habitatposted by Erica Downs on
Does anyone know if, on a University Campus, the owner is still allowed to designate the equivalent required area as "protected for the life of the building" somewhere outside the LPB?
Non Regularly Occupied Spaces
Pilot-Credits EQpc116:Daylight in nonregularly occupied spacesposted by Divya Shroff on
I am trying to document the PILOT credit for a school project and am not sure if the restrooms fall under non regularly occupied spaces.v
Waste category as "construction & Demolition waste"
NC-v4 MRp2:Construction and demolition waste management planningposted by Adam Insan on
One of project located in KSA following construction waste management credit targeting 2 points with 75% diversion as per option 2.
Multitenant Building
EBOM-v4 MPR2:Must use reasonable LEED boundariesposted by Sofia Barahona on
We are currently carrying out the feasibility study for the certification of an existing project in Operation and Maintenance v4.1: Existing Buildings.
Experiences with pursuing the Daylight in nonregularly occupied spaces pilot credit?
Pilot-Credits EQpc116:Daylight in nonregularly occupied spacesposted by Christopher Hoeh on
I'm somewhat surprised by the lack of posts for this topic. We found it matched up nicely with our OPR and desire for appropriate daylighting throughout the project. We actually fell ju
Timeline to join for project team
Pilot-Credits IPpc90:Social equity within the operations and maintenance staffposted by Christoph Weindl on
We're pursuing "Social equity within the project team" with Option 2.
Lighting Boundary if property boundary abuts parking spaces off of a public roadway?
NC-v4 SSc6:Light pollution reductionposted by Crista Shopis on
Hi, my project abuts a parking lot that is basically an expanded shoulder with spaces, directly off of a roadway.
Contaminated Soil
NC-v4 MRp2:Construction and demolition waste management planningposted by Magdalena Kolodziej Rivas on
If a project has a small area of contaminated soil, how should that be incorporated into the Waste Management and Erosion and Sedimentation Plan.