Forum quick links
EDP documents
Pilot-Credits MRpc103:Integrative Analysis of Building Materialsposted by David Dixon on
working on documentation for the credit I am finding that the documentation in EDPs do not translate to the credit matrix and documenting is not smooth
One Greenguard Certificate for the same product marketed by Multiple Companies?
NC-v4.1 EQc2:Low-Emitting Materialsposted by Tiffany Beffel on
Our project used Shaw 4151 LVT Universal Adhesive. Shaw Contract literature makes claim to a Greenguard Certificate that is for the same 4151 universal adhesive, however, the certificate refe
PV system energy going directly to the grid
NC-v4 EAc2:Optimize energy performanceposted by Camilo Velez on
Good afternoon everyone,
Equipments to be Commissioned for Fundamental Commissioning
NC-2009 EAp1:Fundamental Commissioning of Building Energy Systemsposted by Daisuke Miura on
Hi, I have a question regarding the scope of equipments to be commissioned for Fundamental Commissioning.
Definition of Informal Transit
NC-v4 LTc5:Access to quality transitposted by Michelle Rosenberger on
What is the definition of informal transit that is referenced in v4 Step 2 guidance?
IAQ testing credit substitution backwards from 4.1 to 4.0?
NC-v4.1 EQc4:Indoor Air Quality Assessmentposted by Jeff Ross-Bain, PE, LEED Fellow, WELL AP on
Hi all,
Switching Options Post-Preliminary Design Review
NC-v4 LTc4:Surrounding density and diverse usesposted by Darrah Jakab on
We are pursuing Option 2 and received comments in the preliminary design review that makes this option not tenable, but we believe we can achieve Option 1.
Energy modeling of Seconday pump in equest:
NC-v4 EAp2:Minimum energy performanceposted by PURUSHOTHAMAN on
In my project, for the base case as per ASHRAE 90.1-2010 Sys-8, I need to model both the primary and secondary pumps in the chilled water loop.
Would a fieldhouse structure be included within the LEED Boundary
NC-v4 MPR2:Must use reasonable LEED boundariesposted by on
Our project is a community centre that includes a field house structure on site. The fieldhouse is partially enclosed, with the other portion covered by a canopy.
Multiple Cx Agents for the Option Paths
NC-v4 EAc1:Enhanced commissioningposted by Saagar Patel on
I do commissioning and I work at a design firm. When a customer pursues both Fundamental and Enhanced cx- my group would not be able to do the Cx of the project. However, we believe the