Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

EDP documents

Pilot-Credits MRpc103:Integrative Analysis of Building Materials
posted by  David Dixon  on 

working on documentation for the credit I am finding that the documentation in EDPs do not translate to the credit matrix and documenting is not smooth

7
CEO
GreeNexus Consulting, LLC
LEEDuser Premium Member
0 thumbs up
Mon Oct 14, 2024, 12:55 am

One Greenguard Certificate for the same product marketed by Multiple Companies?

NC-v4.1 EQc2:Low-Emitting Materials
posted by  Tiffany Beffel  on 

Our project used Shaw 4151 LVT Universal Adhesive.  Shaw Contract literature makes claim to a Greenguard Certificate that is for the same 4151 universal adhesive, however, the certificate refe

2
Sat Oct 12, 2024, 4:47 pm
2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Fri Oct 11, 2024, 3:16 pm

Equipments to be Commissioned for Fundamental Commissioning

NC-2009 EAp1:Fundamental Commissioning of Building Energy Systems
posted by  Daisuke Miura  on 

Hi, I have a question regarding the scope of equipments to be commissioned for Fundamental Commissioning. 

1
Thu Oct 24, 2024, 10:28 am

Definition of Informal Transit

NC-v4 LTc5:Access to quality transit
posted by  Michelle Rosenberger  on 

What is the definition of informal transit that is referenced in v4 Step 2 guidance?

3
Practice Leader - Sustainability
EUA
LEEDuser Expert
510 thumbs up
Thu Oct 10, 2024, 4:52 pm
3
Technical Director
Centek Laboratories, LLC
LEEDuser Basic Member
13 thumbs up
Wed Oct 9, 2024, 2:32 pm

Switching Options Post-Preliminary Design Review

NC-v4 LTc4:Surrounding density and diverse uses
posted by  Darrah Jakab  on 

We are pursuing Option 2 and received comments in the preliminary design review that makes this option not tenable, but we believe we can achieve Option 1.

2
Director of Sustainability
Fentress Architects
LEEDuser Expert
224 thumbs up
Wed Oct 9, 2024, 12:58 pm

Energy modeling of Seconday pump in equest:

NC-v4 EAp2:Minimum energy performance
posted by  PURUSHOTHAMAN   on 

In my project, for the base case as per ASHRAE 90.1-2010 Sys-8, I need to model both the primary and secondary pumps in the chilled water loop.

1
Thu Oct 24, 2024, 12:06 pm

Would a fieldhouse structure be included within the LEED Boundary

NC-v4 MPR2:Must use reasonable LEED boundaries
posted by     on 

Our project is a community centre that includes a field house structure on site. The fieldhouse is partially enclosed, with the other portion covered by a canopy.

0

Multiple Cx Agents for the Option Paths

NC-v4 EAc1:Enhanced commissioning
posted by  Saagar Patel  on 

I do commissioning and I work at a design firm.  When a customer pursues both Fundamental and Enhanced cx- my group would not be able to do the Cx of the project.  However, we believe the

4
Tue Oct 8, 2024, 12:57 pm