Can consider the air cooled chiller yard as central plant
CI-v4 EAp2:Minimum energy performanceposted by SSN Energy Model on
Hi to all,
Greetings!
I am doing Energy Model as per design documents of office space which has target for LEED ID+C Gold v4.
ASHRAE 90.1.2010 Mandatory & Prescriptive Requirements vs Energy Model
CI-v4 EAc2:Optimize energy performanceposted by SSN Energy Model on
Hi to all,
I am doing energy model for one of our LEED CI Project under v4 rating system.
The following contents are copied from reference guide,
Data center load calculation
Data-Centers-NC-v4 EAp2:Minimum energy performanceposted by Eshagh Yazdanshenas on
I have a data center with 1500 kW nameplate power. I've seen that there are two different diversity factor and usage factor to calculate the total yearly electricity consumption of data center.
Calculations for volume of rainwater managed by GI or LID strategies
NC-v4 SSc4:Rainwater managementposted by RUI MIAO on
How to calculate the Runoff Volume of bioretention area?
Flush-out during occupancy.
NC-v4 EQc4:Indoor air quality assessmentposted by R.L. Bowen on
Our team is working on a CNG bus station renovation project for COTA (Central Ohio Transit Authority).
Incomplete Spaces
NC-v4 WEp2:Indoor water use reductionposted by Ricardo Sá on
Dear All,
we are certifying an office building that includes two incomplete spaces (less than 5% of total building GFA):
Green Vehicle Parking and Charging for a Location with almost no green vehicles
NC-v4 LTc8:Green vehiclesposted by Peko Xejis on
Hello, I am currently doing a project and we want to attempt this credit, we can provide the needed amount of parking and charging equipment, with said equipment meeting the LEED standards, but is
Option 4 Building LCA Clarification
NC-v4 MRc1:Building life-cycle impact reductionposted by Peko Xejis on
Hi, I'm confused about this option, according to the LEEDUSER's viewpoint page of this credit, if I don't have any existing building to use, I cannot pursue this option?
Thanks.
Comingled waste on site - separation at waste facility
CS-v4 MRc5:Construction and demolition waste managementposted by Alicia Ravetto on
Is this always considered a single stream? What method of documentation should the waste facility provide to comply with the requirement of this credit?