Forum quick links
Baseline for curtain wall
NC-2009 EAp2:Minimum energy performanceposted by Francesco Passerini on
A curtain wall is made of glazed parts and opaque parts (spandrels). In the baseline model, how much shall the façade be glazed? Are spandrels considered as an opaque wall or as a frame?
Leakage Test Requirement
NC-v4.1 EQp2:Environmental Tobacco Smoke Controlposted by Mario Angelo Pinoli on
Hi,
I have an high rise residential project and the property wants to permit people to smoke on the balconies.
Campus bus line must provide transportation to the public
NC-2009 SSc4.1:Alternative transportation - public transportation accessposted by Dominique Serrette on
The project is on a campus with access to several campus bus lines within one-quarter mile of the project.
Entryway systems
NC-v4 EQc1:Enhanced indoor air quality strategiesposted by Ricardo Sá on
Dear All,
Reverberation Time Evaluation Scope
Hospitality-NC-v4 EQc9:Acoustic performanceposted by Ricardo Sá on
Dear All,
Applicability to Airport Terminals
NC-v4 EQc9:Acoustic performanceposted by Allan Robles on
Hello LEEDuser community,
Mandatories ASHRAE 90.1-2010 for tenants in Core&Shell LEED v4
CS-v4 EAp2:Minimum energy performanceposted by Mauricio Ramirez on
Hello Dear
LEED-BD+C Hospitality - MRc5 Option 2 for a modular building.
NC-v4 MRc5:Construction and demolition waste managementposted by Susan Di Giulio on
Our project is a hotel for which all guestrooms are being manufactured as modular units. This will certainly save waste, and we are interested in pursuing Option 2.
How can i assure compliance for low emmetting materials? A+ and ECOLABEL certification?
NC-v4 EQc2:Low-emitting materialsposted by Sara BENLOUBA on
ECOLABEL and A+ certification are sufficient for compliance or we must also quantify VOC and Formaldehyde emissions of our project by measuring? I am lost on this credit.
Control monitoring in tenant spaces
CS-v4 EQp1:Minimum indoor air quality performanceposted by Ron Dean on
Hello,