Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Interior Irrigation?

NC-v4 WEp1:Outdoor water use reduction
posted by  Allison Wilson  on 

Our project has interior planting which will be irrigated.

2
Thu Jul 16, 2020, 6:45 am

Smoke/acoustic seal around the door instead of weather seal

CS-2009 IEQp2:Environmental Tobacco Smoke (ETS) control
posted by  Yuko Murata  on 

Residential units in the project have doors facing the corridors which in completely inside of the building as they are in a high-rise tower. 

 

1
Tue Jun 29, 2021, 6:33 am

Solar Panels

CI-v4 EAc1:Enhanced commissioning
posted by  Alexis Voeltner  on 

Do solar panels that are being installed by the building owner need to be commissioned before the LEED submittal or can the commissioning be done later?

4
Sustainability Project Manager
UL Solutions
LEEDuser Expert
11 thumbs up
Thu Jul 16, 2020, 3:37 am

Innovation for Grind-to-Energy?

CS-2009 IDc1:Innovation in design
posted by  Brian Salazar  on 

Hello everyone!  I am working on a CSv3 project where the building owner will be responsible for a rather sizable food service operation within the building.

4
Founder & Community Director
Metricorps
LEEDuser Expert
7782 thumbs up
Wed Jul 15, 2020, 8:49 am

Multi Attribute Optimization

NC-v4 MRc2:Building product disclosure and optimization - environmental product declarations
posted by  Vibha Pai  on 

Is there any USGBC approved program which would help projects achieve credit points pursuing the option 2 multi attribute optimization of MR BPDO-EPD? Thanks in advance!

2
Managing Partner
Ecoimpact Consulting
LEEDuser Expert
171 thumbs up
Tue Jul 14, 2020, 11:57 pm

Mass Floor vs. Slab below grade for CSv4 - Prescriptive Approach

CS-v4 EAc2:Optimize energy performance
posted by  Kena David   on 

We are pursuing CSv4 for a project and using the prescriptive approach for Optimize Energy Performance.

1
Tue Jul 14, 2020, 6:52 pm

Laptop adaptation on flexible workstations

Pilot-Credits EQpc44:Ergonomics approach for computer users
posted by  Carolina Vasquez  on 

In regular flexible workstations, with a desk and a chair, they usually have docks for easier adaptation to laptops.

0

IP-based control system tied to individually controlled fixtures overhead

NC-v4 EQc6:Interior lighting
posted by  Ciaran McCabe  on 

Has anoyone gained Option 1 using an IP based control system. If every light fitting can be controlled via an IP based system will this achieve complaince with Option.

2
Architect - Cx Provider - Building Performance Specialist
GLHN Architects & Engineers
LEEDuser Premium Member
25 thumbs up
Tue Jul 14, 2020, 1:46 pm

Concrete bonding agent

NC-v4.1 EQc2:Low-Emitting Materials
posted by  Laura Charlier  on 

We had a submittal come in that is proposing the use of a "bonding slurry" to be used above grade between the metal deck and concrete slab for each building story.

2
Principal
husARchitecture
LEEDuser Premium Member
3 thumbs up
Tue Jul 14, 2020, 2:52 am

Public Project Currently Purchasing REC's for all Electricity for all Building looking to add Natural Gas Carbon Off-sets

NC-v4 EAc7:Green power and carbon offsets
posted by  Summer Gorder  on 

I am working on a few projects for a public agency that purchases REC's for all of their buildings electricity, and they would like to add natural gas.

1
Mon Jul 13, 2020, 7:23 pm