NC-v4.1 EQc2:Low-Emitting Materialsposted by Jyothsna Giridhar on
We got the following technical advice for a project:
Walkable Project Site
NC-v4 INc1:Innovationposted by Graciela Quiles Gonzalez on
Are facades of existing buildings (not historic) exempt of Requirement number 8 of the Walkable Project Site?
Designing with Nature - Stone indoor finishes
Pilot-Credits EQpc123:Designing with Nature, Biophilic Design for the Indoor Environmentposted by ANTONIO CERECEDA on
Currently we are working in a LEED project which we are pursuing this pilot credit of Designing with Nature, and we are wondering if natural stone vertical finishes on main indoor walls c
Safety First: Re-Enter Your Workspace
CS-v4.1 INc1:Innovationposted by Gustavo De las Heras Izquierdo on
Hello,
Has anyone achieved this credit yet? I so, you could share with us how many measures you implemented and if you received any review comments.
Thanks!
Project Energy Use_Electric or Overall Energy use?
NC-v4.1 EAc5:Renewable Energyposted by Hashir Usman on
Hi,
Industrial washer vs commercial clothes washer
NC-v4 WEp2:Indoor water use reductionposted by Martha Norbeck on
My question to our LEED Coach:
Hot-water design supply and return temperature difference
CS-v4 EAp2:Minimum energy performanceposted by Przemysław Rejczak on
Dear Everyone,
I got a comment for one of our project which in my opinion is not ccompatibe with ASHRAE. We do not have much time for the response, so I decided to ask about it here.
Fire Alarm System components and other facility services subgroups systems
NC-v4 MRc3:Building product disclosure and optimization - sourcing of raw materialsposted by Aaron McEwin on
Previous versions of LEED stipulated the Material and Resource Credits only applied to Divisions 2-10 products.
Fire Alarm System components and other facility services subgroups systems
NC-v4 MRc2:Building product disclosure and optimization - environmental product declarationsposted by Aaron McEwin on
Previous versions of LEED stipulated the Material and Resource Credits only applied to Divisions 2-10 products.
Advanced Energy Metering, Opt.2 - Data Must Be Remotely Accessible
CI-v4 EAc3:Advanced energy meteringposted by Graeme Smith on
We under that... "The data must be remotely accessible"... but how does USGBC define remote accessibility?