Hi Everyone,

We just wanted to tell you about our experience using this credit. 

First thanks everyone for sharing all the information and solving doubts about this credit and other credits.

Our project is a Warehouse in Spain. The problem that we faced here was that this warehouse has an area over 25% of the total area that has an assembly and manufacturing line, so we were not able to certify with Energystar and the energy consumption from this equipment is huge. To solve this issue we have used this pilot credit.

We carried out a load assessment to find out the energy consumption from this industrial area, and to normalize the data we used the information from the production time and production equipment installed.

Thanks