Parking not provided
NC-v4 LTc7:Reduced parking footprintposted by Ana Milinkovic on
Hi everybody.
I have just a simple question. If in my project parking is not provided, can I award this credit?
Test duration
Pilot-Credits EQpc57:Enhanced acoustical performance - exterior noise controlposted by Dionisio Franca on
The site noise assessment must be at least 24 hours long. Is there a similar requirement for the post-construction test?
Project located on reclaimed land
NC-v4 MPR1:Must be in a permanent location on existing landposted by Nermin Hegazy on
I would like to know what is LEED's take on developing a site which is on reclaimed land. The land for the site is not specifically claimed for the project, it has been reclaimed about 1
Insulation Question
NC-v4.1 EQc2:Low-Emitting Materialsposted by Catherine Blakemore on
If pursuing the insulation category, does roof insulation need to be included? I am assuming that it does, but the credit requirements do not specifically say so.
LEEDv4 HD Quality Views Credit - perimeter area calculation
Healthcare-v4 EQc8:Quality Viewsposted by Tim Hemsath on
Page 740 of reference guide, second paragraph "For other areas, confgure the building foor plates such that the foor area within 15 feet (4.5 meters) of the perimeter exceeds the perimeter area req
Kitchen tab for Core and Shell project
NC-v4 WEc2:Indoor water use reductionposted by Linh Dang on
Hello LEED user experts,
CWMP in ND used for individual buildings (BD+C) within ND boundary?
ND-Plan-v4 GIBc16:Solid waste managementposted by Jackson Ludwig on
Working on an ND project, and curious about the CWMP requirement on this credit. Can this same ND CWMP be used on individual buildilngs pursuing BD+C within the ND boundary for materials
Certification time
NC-v4 IPc1:Integrative processposted by Helena Garcia on
Hi everyone,
Does anyone know if there is a time limit or a deadline from when a project is registered until certification is achieved?
Thank you in advance.