Parking not provided

NC-v4 LTc7:Reduced parking footprint
posted by  Ana Milinkovic  on 

Hi everybody.

I have just a simple question. If in my project parking is not provided, can I award this credit?

1
Thu Dec 2, 2021, 2:37 pm

Test duration

Pilot-Credits EQpc57:Enhanced acoustical performance - exterior noise control
posted by  Dionisio Franca  on 

The site noise assessment must be at least 24 hours long. Is there a similar requirement for the post-construction test?

3
Default Avatar
Sustainability Consultant, Energy Modeler
DVM Group
LEEDuser Basic Member
7 thumbs up
Tue Nov 30, 2021, 8:04 am

Project located on reclaimed land

NC-v4 MPR1:Must be in a permanent location on existing land
posted by  Nermin Hegazy  on 

I would like to know what is LEED's take on developing a site which is on reclaimed land.  The land for the site is not specifically claimed for the project, it has been reclaimed about 1

1
Fri Dec 3, 2021, 6:57 pm

Insulation Question

NC-v4.1 EQc2:Low-Emitting Materials
posted by  Catherine Blakemore  on 

If pursuing the insulation category, does roof insulation need to be included?  I am assuming that it does, but the credit requirements do not specifically say so.

3
Sun Nov 28, 2021, 1:06 am

LEEDv4 HD Quality Views Credit - perimeter area calculation

Healthcare-v4 EQc8:Quality Views
posted by  Tim Hemsath  on 

Page 740 of reference guide, second paragraph "For other areas, confgure the building foor plates such that the foor area within 15 feet (4.5 meters) of the perimeter exceeds the perimeter area req

4
Default Avatar
LEEDuser Premium Member
0 thumbs up
Fri Nov 26, 2021, 3:19 pm
3
www.afogreenbuild.com
Green Building Consultant
LEEDuser Premium Member
249 thumbs up
Fri Nov 26, 2021, 9:29 am

CWMP in ND used for individual buildings (BD+C) within ND boundary?

ND-Plan-v4 GIBc16:Solid waste management
posted by  Jackson Ludwig  on 

Working on an ND project, and curious about the CWMP requirement on this credit.  Can this same ND CWMP be used on individual buildilngs pursuing BD+C within the ND boundary for materials

1
Wed Feb 9, 2022, 2:28 pm

Certification time

NC-v4 IPc1:Integrative process
posted by  Helena Garcia   on 

Hi everyone,

Does anyone know if there is a time limit or a deadline from when a project is registered until certification is achieved?

 

Thank you in advance.

8
Wed Nov 24, 2021, 11:31 am

Project with DES

NC-v4 EAc4:Demand response
posted by  Ricardo Sá  on 

Dear All,

 

1