Forum quick links
Location & transportation
Pilot-Credits INpc113:Informing Design Using Triple Bottom Line Analysisposted by Jill Kurtz on
With Scope 3 being such a big part of our carbon emissions, why aren't more categories included in teh location and transportation section?
Imperil and Metric units?
NC-v4.1 MRc4:Material Ingredientsposted by Kristi Merdler on
I have a project in Canada (metric units) but the client wants all documents in Imperial units. Is this a problem for LEED during the review process?
DOASs provide outdoor air to more than one tenant
CI-v4 EAc3:Advanced energy meteringposted by CT G on
We're working on a project where the tenant occupies 2 floors in a 4 story-building. This building has DOAS units that supply OA to all 4 floors.
Missing parameters in water analysis - urgent query
NC-v4 WEc3:Cooling tower water useposted by Nermin Hegazy on
Hello all!
Solar panels outside LEED boundary
CS-v4 EAc5:Renewable energy productionposted by Jefferson Au-Yeung on
Hi
Concrete
NC-2009 MRc5:Regional Materialsposted by Steve Willey on
Is there anyway to calculate for cost per pound for cement, fly ash, limestone and sand
Greenhouse gas emissions factors - following guidance from ACP EApc95
NC-v4 EAc7:Green power and carbon offsetsposted by Shannon Oletic on
Hello,
MR credids
NC-v4.1 MRc4:Material Ingredientsposted by Kristi Merdler on
My project is using a pre-fabicated panel (walls and ceilings) inclusive of doors, windows and ceiling grid lights. All of these components are part of the panel design.
ONSITE RENEWABLE ENERGY FOR PREREQUISITE
NC-v4.1 EAp2:Minimum Energy Performanceposted by Jorge Lopez de Obeso on
Is it possible to meet the Prerequisite and Credit with onsite renewable energy under V4.1 ?
Non default use time for lavatory faucets
NC-v4 WEc2:Indoor water use reductionposted by Ruju Rathod on
We would like to use a non default lavatory faucet duration of 15 seconds instead of the 30 seconds.