Existing Building with DES: choosing v4/v4.1, DES modelling strategy

CS-v4.1 EAc2:Optimize Energy Performance
posted by  Sarah Leenknegt  on 

(Appologies for double posting, I posted the same question on the v4-forum. Just realized it is probably more appropriate on the v4.1 page.)

Hi everyone

1
Thu Feb 17, 2022, 5:20 pm

Surrounding Density and Diverse Uses

NC-v4.1 LTc4:Surrounding Density and Diverse Uses
posted by  mika sundberg  on 

I have a question about what Path 2- connected site and whether a project has been previously developed. I am working on a project that is situated adjacent to a park.

1
Fri Feb 11, 2022, 4:54 pm

B.U.G. determination

NC-v4 SSc6:Light pollution reduction
posted by  Francesco Passerini  on 

Hello, I remember a tool online for the determination of the BUG indexes. The upload of the photometric curves was necessary. I am no more able to find that. Is that no more available?

2
Sr. Electrical Engineer
Integrated Design Solutions
LEEDuser Expert
516 thumbs up
Sat Jan 29, 2022, 8:45 pm

Not sure I'm satisfied with this credit

Pilot-Credits MRpc127:Timber Traceability
posted by  Raphael Sperry  on 

I guess this debate has been going on for a while but I don't think the new "Timber Traceability" credit is a huge step forward for the environment.

3
Associate Principal, Global Social Equity Skills Leader
Arup
LEEDuser Basic Member
2 thumbs up
Fri Jan 28, 2022, 7:54 pm

Wall Components

NC-v4 EQc2:Low emitting materials
posted by  LUCY WILLIAMS  on 

When reporting for the wall, ceiling category under Option 1, do all of the interior partition components need to be complaint- the gypsum board, the tape, the joint compound, the studs and the pai

18
Director of Sustainability
Walker Architects
LEEDuser Premium Member
3 thumbs up
Fri Jan 28, 2022, 3:56 pm

Fog Installation on the rooftop

NC-v4 WEc1:Outdoor water use reduction
posted by  Christoph Keck  on 

Hi,

our project has a fog installation on it´s rooftop.

The water consumption of said installation would be 3,6 l/min.

3
CES Clean Energy Solutions GmbH
LEEDuser Basic Member
7 thumbs up
Fri Jan 28, 2022, 2:25 pm

Integrative Analysis of Building Materials

Pilot-Credits MRpc103:Integrative Analysis of Building Materials
posted by  Chris Lombardo  on 

The project team pursued this pilot after achieving the MRcBPDO EPD/HPD credits, which allowed us to better understand the lifecycle of each product we anayzed from an environmental and human healt

1
Fri Apr 8, 2022, 1:44 pm

Legal Wood - Wood Harvested on-Site?

NC-v4 MRc3:Building product disclosure and optimization - sourcing of raw materials
posted by  Vincent Pieri  on 

We are working on the modernization of the Visitor's Center at the El Yunque National Rainforest in Puerto Rico.  El Yunque is a USFS National Park, and the forest is managed by the USFS and U