Enhanced CX 'Design Firm'

NC-2009 EAc3:Enhanced Commissioning
posted by  Julianne Laue  on 

If a firm is a AE firm and are signing the arch drawings, but not involved in MEP...can an engineer in the firm be the CX?

2
LEED Fellow
Integrated Design + Energy Advisors, LLC
LEEDuser Expert
377 thumbs up
Wed Mar 30, 2011, 8:20 pm

Bike storage for residents with disabilities?

NC-2009 SSc4.2:Alternative Transportation—Bicycle Storage and Changing Rooms
posted by  Stefania Minotti  on 

I’m presently working on a mid-rise residential social housing building with 5 stories and 76 units. 67 of these apartments are 1 bedroom and 9 are two bedroom.

6
Wed Mar 30, 2011, 5:25 pm

Items to be implemented for EAc2.2

EBOM-2009 EAc2.2:Existing Building Commissioning—Implementation
posted by  Mark Campbell  on 

It is clear that the low cost/no cost items uncovered during the investigation phase in EAc2.1 must ALL be implemented to satisfy the requirements of EAc2.2. My Question: Must ALL of the low-cost/

3
Default Avatar
VP
Chicago Metallic Corporation
LEEDuser Basic Member
42 thumbs up
Wed Mar 30, 2011, 11:36 am

Reducing Building Floor Space

NC-2009 IDc1:Innovation in Design
posted by  David Hubka  on 

I am involved with a project in which the design team would like to select compact storage bins.

2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Tue Mar 29, 2011, 6:51 pm

Lighting Controls

NC-2009 IEQc6.1:Controllability of Systems—Lighting
posted by  shaun Andriano  on 

Our IEQc6.1 credit was approved during the design phase based upon the following: The space is a large open area with cubicle workstations.

4
Default Avatar
Project Manager
C2 Design Architecture
LEEDuser Basic Member
23 thumbs up
Tue Mar 29, 2011, 5:37 pm

Submittals - does one need to upload spec sheets?

CI-2009 WEc1:Water Use Reduction
posted by  Patricia Ewanski  on 

Simple question - My project is not yet registered so I can't see what documenation is necessary to substantiate claims of water efficiency.

3
Tue Mar 29, 2011, 4:11 pm

LEED certification without heating and cooling systems

NC-2009 EAp2:Minimum Energy Performance
posted by  Felipe Duran  on 

I am working on a school project and it does not consider a heating system nor a cooling system at all ¿Is it possible to certified a building which does not have a these systems and therefore the

5
Director of Operations
Transwestern Sustainability Services
LEEDuser Basic Member
355 thumbs up
Tue Mar 29, 2011, 1:04 pm

Commingled materials?

CI-2009 MRc2:Construction Waste Management
posted by   Habitech Distretto Tecnologico Trentino  on 

Hello. We are working on a CI project. We have only three types of waste (mixed materials, mix of concrete and mix of gyps), with three different containers.

3
Tue Mar 29, 2011, 4:14 am

economic assessment

EBOM-2009 WEp1:Minimum Indoor Plumbing Fixture and Fitting Efficiency
posted by  Pablo Fortunato Suarez  on 

What the client has is a project for proposed upgrades since the building is quite old, making upgrades necessary.

3
Default Avatar
Project Manager
SSRCx, LLC
LEEDuser Basic Member
7 thumbs up
Tue Mar 29, 2011, 2:07 am

outdoor air unit system type

NC-2009 EAp2:Minimum Energy Performance
posted by  Ana Davidovic  on 

I have a project that is classified as a high rise residential building.

3