LEED V2 - NC A Building Housing a CHP Plant for a Campus DES
NC-2009 EAc1:Optimize Energy Performanceposted by Melissa Crowe on
I have a CHP project that I cannot seem to fit in any one clearly defined compliance path.
Energy Standards Comparison
NC-2009 EAp2:Minimum Energy Performanceposted by Sam Watters on
Hello, I'm trying to work through how much more efficient my project will be over ASHRAE 90.1 2007, and I wondered if anyone had experience with how the standard compares to IEC 2006. The local b
LEED CS - tenant vs Owner insulation
CS-2009 EAp2:Minimum Energy Performanceposted by Lawrence Lile on
I am working with an owner who is developing a speculative office building under LEED CS 2009.
Ventilation rate in garage with local code
NC-2009 IEQp1:Minimum IAQ Performanceposted by Daniel Strömberg on
Dear All, I have a further question about the ventilation rate. I am currently in a LEED project in Europe, which has a garage in the building.
Window Film Adhesive
CI-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealantsposted by Jessica Aubert on
We are working on a CI project which is bounded on three sides by a glass atrium space.
Commissioning of Systems not required in prereq
NC-2009 EAc3:Enhanced Commissioningposted by Shauna Sproul on
Can points be achieved in innovation and design for commissioning of systems not required in prereq, for example the building envelope? I understand 2012 is addressing this, but what about 2009? I
CxA designation question
NC-2009 EAc3:Enhanced Commissioningposted by Blas Beristain on
Hello! We are involved in a project of a new headquarters of an architectural firm. In this project, the owner will be the architectural firm.
CxA Contract Question
NC-2009 EAc3:Enhanced Commissioningposted by Mark Haynie on
We hold a contract for construction of a project as the General Contractor. We also have contracted with the design firm (Architect) for the project.
Round-up
EBOM-2009 SSc3:Integrated Pest Management, Erosion Control, and Landscape Managementposted by SIG - Sustainability Main Account on
I'd like to confirm that Round-Up Pro (EPA # 524-475) is okay to use for weed control in sidewalk cracks.
All indoor water is outside of project owner scope
CS-2009 WEp1:Water Use Reductionposted by Mary Frances Stotler on
I'm trying to figure out how to document compliance with WEp1 and WEc3. I'm dealing with a situation where all indoor water use is part of the tenant build-out.