Window Film Adhesive

CI-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealants
posted by  Jessica Aubert  on 

We are working on a CI project which is bounded on three sides by a glass atrium space.

2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Sun Mar 25, 2012, 7:34 pm

Commissioning of Systems not required in prereq

NC-2009 EAc3:Enhanced Commissioning
posted by  Shauna Sproul  on 

Can points be achieved in innovation and design for commissioning of systems not required in prereq, for example the building envelope? I understand 2012 is addressing this, but what about 2009? I

2
LEED Fellow
Integrated Design + Energy Advisors, LLC
LEEDuser Expert
377 thumbs up
Fri Mar 23, 2012, 9:16 pm

CxA designation question

NC-2009 EAc3:Enhanced Commissioning
posted by  Blas Beristain  on 

Hello! We are involved in a project of a new headquarters of an architectural firm. In this project, the owner will be the architectural firm.

5
Sustainability Manager
YR&G
LEEDuser Basic Member
55 thumbs up
Fri Mar 23, 2012, 8:57 pm

CxA Contract Question

NC-2009 EAc3:Enhanced Commissioning
posted by  Mark Haynie  on 

We hold a contract for construction of a project as the General Contractor. We also have contracted with the design firm (Architect) for the project.

2
Default Avatar
Commissioning Engineer
LEEDuser Basic Member
15 thumbs up
Fri Mar 23, 2012, 8:52 pm

Round-up

EBOM-2009 SSc3:Integrated Pest Management, Erosion Control, and Landscape Management
posted by  SIG - Sustainability Main Account  on 

I'd like to confirm that Round-Up Pro (EPA # 524-475) is okay to use for weed control in sidewalk cracks.

2
Sustainability Professional
LEEDuser Expert
430 thumbs up
Fri Mar 23, 2012, 8:17 pm

All indoor water is outside of project owner scope

CS-2009 WEp1:Water Use Reduction
posted by  Mary Frances Stotler  on 

I'm trying to figure out how to document compliance with WEp1 and WEc3. I'm dealing with a situation where all indoor water use is part of the tenant build-out.

3
Fri Mar 23, 2012, 4:23 pm

Secure bicycle racks and secure bicycle storage

CS-2009 SSc4.2:Alternative Transportation—Bicycle Storage and Changing Rooms
posted by  Caroline Ma  on 

Any difference between Secure bicycle racks and secure bicycle storage? In CS project with area larger that 300,000 sq.ft. (CS case 2), we need to provide secure bicycle storage.

3
Sustainability Consultant
Skanska Czech Republic
LEEDuser Basic Member
128 thumbs up
Thu Mar 22, 2012, 10:52 pm

No Engineer on Project

CI-2009 IEQp1:Minimum IAQ Performance
posted by  Paul Meyer, PE, CEM, CBCP, GBE LEED AP  on 

All HVAC mechanical systems were existing. Only the ductwork was installed. There is Engineer for this project is there a way to comply without the signature?

2
Thu Mar 22, 2012, 2:49 pm

Steel Joists & Deck

NC-2009 MRc5:Regional Materials
posted by  Jeremy Hatfield  on 

I am a bit confused when it comes to Steel Joist and Deck. New Millennium and Vulcraft obtain steel from mills.

4
Thu Mar 22, 2012, 1:44 pm

Stated Cost

NC-2009 MRc5:Regional Materials
posted by  matthew convery  on 

When calculating both the regional material and recycled content material percentages, do you use the subcontractors cost or can they include their markup?

3
Thu Mar 22, 2012, 1:41 pm