To achieve the required time needed for flush out, do we only take into consideration the OA louver volume (CFM)? So if we have a total flush volume of 15,000,000 and the OA louver has a CFM volume of 250 then our flush out time would be 41.7 days. Is this correct? I would think we would have missed some variables by doing that.