VAV system required for small DX?

CI-2009 EAc1.3:Optimize Energy Performance—HVAC
posted by  Daniel Thien  on 

I am researching option 1 for Advanced building requirements. We are working in a 1 story industrial park and are installing new 10 ton and below DX RTUs.

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Tue May 15, 2012, 10:04 pm

Urinal Metered Faucet

NC-2009 WEp1:Water Use Reduction—20% Reduction
posted by  Luis Lagomarsino  on 

We are working on a project that will include metered urinal faucets with an adjustable 4 - 10 seconds timer.

2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Tue May 15, 2012, 7:02 pm

Opaque skylights

NC-2009 EAc1:Optimize Energy Performance
posted by  Francesco Passerini  on 

In the building which I’m modelling there are plastic skylights which are practically opaque.

3
Tue May 15, 2012, 5:50 pm

LEED MV Credits compliance with Option D

NC-2009 EAc5:Measurement and Verification
posted by  Ameet AA  on 

To achieve this credit, during the CONSTRUCTION Stage we just have to submit the IPMVP-OPTION D compliant Measurement and Verification Plan together with Diagram showing the locations of any meter

2
Mechanical Engineer
Integral Group
LEEDuser Expert
342 thumbs up
Tue May 15, 2012, 4:49 pm

shading for 5-6 storey building

CS-2009 EAc1:Optimize Energy Performance
posted by  charles bell  on 

Can shadow/shading from adjacent buildings be factored into our program model?

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Mon May 14, 2012, 9:15 pm

Naturally Ventilated Garment Factory for 90.1 appendix G

NC-2009 EAp2:Minimum Energy Performance
posted by  Kevin Sullivan  on 

We are looking to certify a garment factory in Dhaka which will not have any conventional HVAC systems.

9
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Mon May 14, 2012, 5:42 pm

documenting uneven male/female occupancy

NC-2009 WEp1:Water Use Reduction—20% Reduction
posted by  Marni J Evans  on 

Hello All, Can you please provide your insight?

12
Mon May 14, 2012, 1:09 pm

Residential Kitchen Sink / Kitchen Sink / Public Lavatory Faucet

NC-2009 WEp1:Water Use Reduction—20% Reduction
posted by  Udana Ratnayake  on 

We are working in a hotel project where no kitchen sinks have been installed in guest rooms. guests come to restaurants within hotel premises to take meals.

2
Mon May 14, 2012, 11:56 am

Outdoor Airflow Measurement with constant volume ventillation

EBOM-2009 IEQc1.2:IAQ Best Management Practices—Outdoor Air Delivery Monitoring
posted by  Michael Smithing  on 

Our building measures the outdoor airflow at the AHU. As we have a constant volume system (fan-coils) with 100% fresh air, from that point onward the airflow is not varied.

3
THREE Consultoría Medioambiental
LEEDuser Basic Member
1 thumbs up
Fri May 11, 2012, 6:58 pm

Changing CxA agents after Final Design

NC-2009 EAc3:Enhanced Commissioning
posted by  Elle Brown  on 

Due to issues with the contract and how our project was funded, we may be forced to get a new CxA to continue the project after final design.

3
Fri May 11, 2012, 6:24 pm