Forum quick links
Regularly occupied spaces in retail/grocery store?
EBOM-2009 IEQc2.4:Daylight and Viewsposted by Alexander Aaltonen on
I am dealing with a case where the only explicit "work stations" are the cashier areas in the grocery store...
High Trans. Building - No fixtures for Trans. Occupants
NC-2009 WEp1:Water Use Reduction—20% Reductionposted by James Del Monaco on
I have a 7,000 SF Physical Education Building which has a majority of the space decicated to PE type activities such as dancing, weightlifting, etc.
Temporized shower
NC-2009 WEp1:Water Use Reduction—20% Reductionposted by Giorgia Lorenzi on
I have a metering shower: temporized for 30 second cycle, 10 liter/minute (from product data sheet). WEp1 simple form on leedonline notes "When using the metering lavatory faucet, please convert al
area calculations
NC-2009 IEQc8.1:Daylight and Views—Daylightposted by Carrie Laurendine on
first post ever.. no doubt dumb questions (sorry). Any input much appreciated. 1) do kitchens in a condo development count as regularly occupied? bedrooms?
Fans pressure - Baseline and Proposed
NC-2009 EAp2:Minimum Energy Performanceposted by Luana Bertoletti on
Hi, I have a doubt related to the pressure to be considered for the baseline and proposed fan power.
Private vs. Public Lavatory Faucets
Schools-2009 WEp1:Water Use Reduction—20% Reductionposted by Alison Y Rivenburgh on
I am working on two elementary schools, and the lower grade levels have private restrooms intended for individual student use in each classroom.
School Kitchen Pre-Rinse and Wash Sinks
Schools-2009 WEp1:Water Use Reduction—20% Reductionposted by Art Irwin on
I am working on a high school project that includes a kitchen with both a pre-rinse sink and a three-tub sink that will have two faucets.
Lease agreement (signed by tenants)
CS-2009 IEQp1:Minimum IAQ Performanceposted by Rubén M. R. on
I'm working on a mixed-use CS project.
IAQ Testing method
NC-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancyposted by Adi Negara, LEED AP BD+C on
It's clear that for this credit, LEED only accepted IAQ testing using EPA or ISO method.
Facade lighting, Interior / exterior?
CS-2009 EAp2:Minimum Energy Performanceposted by Robert Gomez on
Hello, If facade lighting are installed at the perimeter inside the building, should this be considered interior or exterior LPD? These lights will be controlled / operated by the base building a