Material Ingredient Reporting
CS-v4.1 MRc4:Material Ingredientsposted by Elinor Sullivan on
When I input the different material ingredient reporting certificates ie: Declare labels, HPD etc...
HOW MANY METERS
Hospitality-CI-v4.1 EAc3:Advanced Energy Meteringposted by JORDI CASTELLANO on
We are conducting a certificate LEED for a student residence.
We have a doubt regarding the meters that must be placed. We don't know if we:
Trend of water meter and leak sensor in Japan projects
Pilot-Credits WEpc153:Water Leak Detection and Monitoringposted by Yohei Ohashi on
I am seeking to achieve Pilot-Credits WEpc153 - Water Leak Detection and Monitoring for LEED ID+C. The Project in Japan generally is required to install a tenant level water meter and
Parking Lots at undergraound at the basement
NC-v4 LTc7:Reduced parking footprintposted by Stephan Zweig on
Hello,
I have following question:
If in a project there are parking lots in the building at the basement, can this project be eligible for the credit “reduced parking”?
Bicycle storage & shower facilities for multiple buildings
CS-v4 LTc6:Bicycle facilitiesposted by James Jin on
Hi all,
Problem with Rainfall Event Calculator
NC-v4 SSc4:Rainwater managementposted by Timothy Ian Middleton on
We have just realised that the percentile value given by the LEED Rainfall Event Calculator (https://www.usgbc.org/resources/leed-v4-rainfall-events-calculator) was incorrect, just before implement
Baseline System for District Energy System (DES) Option 2
NC-v4 EAc2:Optimize energy performanceposted by Keith Lane on
I'm working on a 73,000 s.f. clasroom building that has air-cooled chiller and boiler plants connected to a seperate building so need to follow the DES guidelines.
Selection of baseline system type for industrial object - Number of floors Vs area
NC-v4 EAp2:Minimum energy performanceposted by Anna Korinkova on
Hello everyone,
Modification of the lighting boundary - 4 lane street
NC-v4 SSc6:Light pollution reductionposted by Anna Korinkova on
Hello everyone,
I would like to ask for a clarification related to the allowed modification of the lighting boundary.
V4 BDC Multifamily Midrise LEED AP Homes point out of reach
NC-v4 INc2:LEED Accredited Professionalposted by Sue Bryant on
The V4 requirement is for a LEED AP Homes to be on the project team. That team member, however, cannot be part of the verification team.