Hi Everyone,

For a C&S project in LEED V4, I'm thinking to switch "Cooling Tower Water" in V4.1 "Optimize Process Water" because there is no cooling Tower in the project. But I did'nt undertand if it's allowed to switch only this credit or if we must switch also Indoor Water use and Outdoor Water use, because the points of this 3 credits moved in V4.1.

Thanks in advance for your answers