Forum quick links
Commingled Waste Documentation
NC-2009 MRc2:Construction Waste Managementposted by Angie Allen on
Off-site sorting of the construction waste was used for our project. The hauler/material recovery facility provided project-specific recycling rates for each haul by material type.
Selling SREC's question
NC-2009 EAc2:On-Site Renewable Energyposted by Todd Bundren on
I am working on a project with two large solar arrays on a parking garage, both are separately metered.
Measurement option and 500fc limit
NC-2009 IEQc8.1:Daylight and Views—Daylightposted by Erin Holdenried on
For Option 3 Measurement, can an area with measurement greater than 500 fc count towards the credit if the space has glare control devices, such as internal shades?
Vegetated areas
NC-2009 SSc6.2:Stormwater Design—Quality Controlposted by Patricia Missawa on
I’m having some doubts on how to define the stormwater volume treated by different types of vegetated areas since in Brazil we don’t have any study related to it. 1- If my project has a flat vegeta
For EBOM, do we do a threat rating assessment?
Pilot-Credits SSpc55:Bird collision deterrenceposted by Lee Ann Walling, LEED AP ND on
We are a state natural resources agency with lots of bird strikes, so we would like to pursue this credit as part of our LEED EB: O&M project.
Performance Period
Pilot-Credits SSpc55:Bird collision deterrenceposted by Sarah Brophy on
I see from the EBOM flow-chart that there is a performance period of three years in addition facade monitoring plan establishment. Am I interpreting this correctly?
Geothermal (Sometimes you're in, sometimes you're out!)
CS-2009 EAc2:On-site Renewable Energyposted by Katie Mesia on
We are in schematic design on a CS project. The project will have underground parking and will use piles as a foundation.
Efficiencies for System 4 – PSZ-HP (packed roof top heat pump)
NC-2009 EAc1:Optimize Energy Performanceposted by Francesco Passerini on
According to Table G3.1.1A for the baseline model I have to model System 4 – PSZ-HP (packed roof top heat pump). I’m wondering what efficiencies I have to consider.
Thermal comfort for fitness center
NC-2009 IEQc7.1:Thermal Comfort—Designposted by HOUCINE TLEMSANI on
I am working on a fitness center where the temperature is maintained low and the air velocities adequate thru the use of fans. The ASHRAE tool show that the people that are working out and have a
Automatic vs Manual shades
NC-2009 IEQc8.1:Daylight and Views—Daylightposted by Mike Decoster on
We are working on a LEED 2009 NC project and looking at the daylighting.