FAQs about EAp2 :

For a project outside the U.S., how do I determine the Target Finder score?

Do hotel rooms need automatic light shut-off control?

How commonly are the 90.1 mandatory compliance forms submitted as part of EAp2/EAc1?

The Section 9 space-by-space method does not include residential space types. What should I use?

Can the Passive House Planning Package (PHPP) be used to energy model for LEED?

Is it acceptable to model a split-type AC with inverter technology compressor as a heat pump, like modeling VRF?

Can the Trace 700 'LEED Energy Performance Summary Report' by uploaded to LEED Online in lieu of the Section 1.4 tables spreadsheet?

A portion of our building envelope is historic. Can we exclude it from our model?

Which baseline HVAC system do I use if my building has no heating or air conditioning?

For an existing building, do I need to rotate the model?

Our project has a diesel backup generator. Should we include it in our energy model?

Our project has a large process load—75%. Despite our efforts to make an efficient HVAC design, the cost savings are minimal. What can we do to earn this prerequisite and be eligible for LEED certification? Is there any flexibility in how we model the p

Can SHGC be higher in the proposed than in the baseline model?

Our process load is higher than 25%. Do we have to justify that?

Do I need to justify the electrical and fuel rates I am using in my model?

Our local code references ASHRAE 90.1-2010. Should I use that for my documentation, or 90.1-2007?

Can I claim exterior lighting savings for canopy lighting even though a baseline model cannot include shading elements?

The project is built on a site with existing exterior lighting installed. How should this be accounted for?

Can mezzanines open to floors below be excluded from the energy model?

How do I provide a zip code for an international location?

View answers »

Forum discussion

NC-2009 EAp2:Minimum Energy Performance

proposed case model - if design is not completed or CS project

proposed case model - if design is not completed or CS project I need some closure. The way I read this is that if the HVAC design is not completed or not including the buildout of the HVAC in the enduser areas, then you should model the Baseline systems in the proposed model. You can't go around mixing them up, i.e. "as designed" up to the zones and then "baseline system(s)" for the zone buildout. I can't see how that would work.

0

You rely on LEEDuser. Can we rely on you?

LEEDuser is supported by our premium members, not by advertisers.

Go premium for $15.95  »

Wed, 11/21/2012 - 14:15

And yet that is what you are required to do. It can get a bit messy to model depending on the systems involved. In some cases you will need to create a stand alone system for those zones. Keep in mind that you are not actually designing the baseline system in the proposed to actually work from a design perspective, it just needs to work thermodynamically.

Wed, 11/21/2012 - 14:39

If the design has a VAV system upto the zones where the designed part ends and the buildout begins, and I had to hop over to ASHRAE baseline from that point...it may be the the zone systems are supposed to be PSZ-HP. How on earth am I suppost to link these two systems, even thermodynamically...and they have totally different control stradegies. All this could mean is serious work around work... meaning the baseline system selection for that part is often going to be "up for grabs", just to make it work. I'll be honest: I've tried both...and I don't like messy.

Wed, 11/21/2012 - 15:34

Think of these zones as being like a server room (only bigger) with a separate system. We model that all the time. Beyond that all I can offer is sympathy!

Add new comment

To post a comment, you need to register for a LEEDuser Basic membership (free) or login to your existing profile.