NC-2009 PIf3:Occupant and Usage Dataposted by RETIRED on
I am trying to locate a document or more information from USGBC regarding the Principal Project Building Activities.
SSp2
Schools-2009 SSp2:Environmental Site Assessmentposted by Mike Walker on
Can a Phase I be eliminated by moving directly to a Phase II assessment?
Return fan for baseline model
NC-2009 EAc1:Optimize Energy Performanceposted by Francesco Passerini on
Par.
ASHRAE Standard 90.1 Table G3.2 and occupancy sensors
CI-2009 EAc1.1:Optimize Energy Performance—Lighting Powerposted by Alex AC on
Hi everybody, My team and I are working on a CI project (office floor) where the tenant has installed occupancy sensors for up to 75% of connected lighting load.
Doubt about climatic zone outside US
CS-2009 EAp2:Minimum Energy Performanceposted by Elodie DUMAS on
Hi all We work on a office project at Marseille France with the Leed CS 2009 ; According to - Table B-3 International Climate Zones Ashrae 90.1 2007 : Marseille / France is located in zone 4 - § B
Total daily occupancy, adjusting peak number in table Plf3-3
NC-2009 PIf3:Occupant and Usage Dataposted by Tom O'Neil on
My project has completed the initial review and I now realize that the peak transient occupancy number I listed in table Plf3-3 is incorrect.
New Table 1.4 Spreadsheet SI-Units
NC-2009 EAp2:Minimum Energy Performanceposted by Johannes Hopf on
Dear all, we gladly noticed that the Table 1.4 spreadsheet improved a lot. Now it is more like a interactive toolkit. Unfortunately most of the items are just in IP-Units available.
Boilers minimum efficiency ASHRAE 90.1
NC-2009 EAp2:Minimum Energy Performanceposted by Ricardo Sá on
Can anynone clarify if boilers minimum efficiency requirements set in table 6.8.1 F is based on fuel higher heating value (HHV) or lower heating value (LHV)?
AIR ECONOMIZERS AND SERVER ROOMS
CI-2009 EAp2:Minimum Energy Performanceposted by TOMAS URIBE on
Hello everyone, I’m working on a Commercial Interior Project following the simulation´s path, in section 11.3.2 item e, says: “Budget Building system listed in table 11.3.2A shall have outdoor ai
NFRC test
NC-2009 EAp2:Minimum Energy Performanceposted by Jae Yong Park on
Hello. my project is in outside of USA. Because of that, there are many obstacles to get NFRC test about fenestration. can i omit this test in my project?