Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Filling out the credit form for Option 2 Path 1

NC-2009 WEc1:Water efficient landscaping
posted by  Erin Holdenried  on 

I have a project that is using captured rainwater only, no potable water, to supply the irrigation system. However, the credit form does not seem to have this option.

2
Founder & Community Director
Metricorps
LEEDuser Expert
7781 thumbs up
Mon Apr 8, 2013, 4:04 pm

Compressed Natural Gas Excavation Equipment

NC-2009 SSp1:Construction activity pollution prevention
posted by  Janna Nash  on 

Can anyone tell me if there is a LEED NC credit that would "reward" a project for using Compressed Natural Gas in excavation and other construction equipment?

2
Founder & Community Director
Metricorps
LEEDuser Expert
7781 thumbs up
Mon Apr 8, 2013, 3:59 pm

LEED AP Consultant Fee

EBOM-2009 IOc2:LEED Accredited Professional
posted by  Rodney Berry  on 

I am currently working on a project in conjunction with my MBA studies regarding LEED EB certification.

2
Founder & Community Director
Metricorps
LEEDuser Expert
7781 thumbs up
Mon Apr 8, 2013, 2:57 pm

Cradle to cradle certificate as ACP?

NC-2009 IEQc4.3:Low-emitting materials - flooring systems
posted by  Isolda Strom  on 

Dear All, I am working on a LEED project in Europe. Our architect is applying several products with Cradle to cradle certificates.

3
Mon Apr 8, 2013, 2:23 pm

Mandatory provisions for a heat pump

NC-2009 EAp2:Minimum energy performance
posted by  Francesco Passerini  on 

I have to model a heat pump that outside the building exchanges heat with the external air and it exchanges heat with the building, i.e. with the internal part of the HVAC plant, thorough water.

3
Mon Apr 8, 2013, 2:05 pm

Water Efficient landscaping - finding the ETo

NC-2009 WEc1:Water efficient landscaping
posted by  Robert Thomas, CPD, LEED AP BD+C  on 

How can I find the evapotranspirtaion rate, ETo, for various plants in various regions, and can this be found on LEEDuser's website?

5
Default Avatar
Urban Planner, LEED AP ND
Ecology & Environment, Inc.
LEEDuser Basic Member
56 thumbs up
Sun Apr 7, 2013, 3:14 pm

Mechanical plans ando/or drawings

NC-2009 PIf4:Schedule and Overview Documents
posted by  JOSE R. TAGLE  on 

Hello, I'm on a New Construction project and Preform4 asks for Mechanical plans and/or drawings, i'm not sure if these refer to HVAC plans only, or if it includes other plans such as MEP ones (HVAC

2
Thu Apr 4, 2013, 8:42 pm

How many credit points does one get by offsetting 7%.

CS-2009 EAc2:On-site renewable energy
posted by  Tuana Papile  on 

By using on-site renewable energy for 7% of the total energy, do we get now 7 points compared to the 4 points for NC? Thank you

6
Thu Apr 4, 2013, 6:34 pm

Control of verhead lighting through VOIP phone integration

NC-2009 IEQc6.1:Controllability of systems - lighting
posted by  Saju Varghese  on 

Would VOIP phone integration lighting controllability of individual workstations (in open offices) count towards the credit, instead of using task lighting?

2
Thu Apr 4, 2013, 5:33 pm

Glazing Sealant / Adhesive

NC-2009 IEQc4.1:Low-emitting materials - adhesives and sealants
posted by  Catherine Blakemore  on 

Does a glazing sealant get logged under the structural glazing adhesive category? Or should it be logged under Interior Sealants - Architectural?

4
Default Avatar
LEED AP BD+C ,Homes,IDC,OM
LEEDuser Basic Member
17 thumbs up
Thu Apr 4, 2013, 3:46 pm