Approved Documentation for the California Department of Public Health General Emissions Evaluation

NC-v4.1 EQc2:Low-Emitting Materials
posted by  Summer Gorder  on 

We are having trouble getting proper documentation from Manufacturers for this additional requirement.

12
Program Manager
UL Solutions
LEEDuser Premium Member
10 thumbs up
Thu Nov 10, 2022, 5:50 pm

Multizone or Single Zone 62.1 Calculation?

NC-v4.1 EQp1:Minimum Indoor Air Quality Performance
posted by  Jon Silhol  on 

We are designing a TV studio that has two ventilation zones; 1) Stages, studios and 2) Auditorium for seating areas within the TV studio.  There is a dedicated single zone, recirculation AHU s

0

No Cooling Tower Sweden

Pilot-Credits WEpc94:No Cooling Tower
posted by  Louise Holmstedt  on 

We are pursuing this pilot credit as ACP for a Swedish Project. We Think it is fair that Projects without cooling Towers can achieve the no cooling Tower credit too.

0

On site or Off site seperation

CS-v4 MRc5:Construction and demolition waste management
posted by  Andrea Tirao  on 

Our project has extensive generation of wastes into different activity zones.

0

Buildable Land

NC-v4 LTc4:Surrounding density and diverse uses
posted by  Deborah Stadler  on 

Does a Regional Detention Pond for a planned development count as 'buildable land' per LEED?  We think since it has been set aside for water retention, is should not be included in the 'builda

1
Fri Nov 11, 2022, 8:18 pm

Change in pilot credit requirements

Pilot-Credits WEpc147:All-Gender Restrooms
posted by  Megan Leslie  on 

One thing our team noticed was that the pilot credit requirements have changed over time.  Originally the requirement said "Facilities SHOULD provide means for the distribution of menstruation

0

LEED Modeling Requirements for a CI projects

CI-v4 EAp2:Minimum energy performance
posted by  elvin ruya  on 

Hi,
We have a LEED CI project where our scope only includes 2nd floor and floors 10th to 16th of a 39 story building. My main question is;

1
Wed Nov 9, 2022, 9:46 pm