Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Counting existing trees on site towards open space

NC-2009 SSc5.2:Site development - maximize open space
posted by  Mike Stopka  on 

I am trying to meet the 30% open space target. The project has plenty of open pedestrian-oriented hardscape area.

3
Default Avatar
Architect
Optimized Design Solutions
LEEDuser Basic Member
4 thumbs up
Fri Sep 13, 2013, 2:03 pm

Two Multi-Occupant Spaces with incomplete wall separation

NC-2009 IEQc6.2:Controllability of systems - thermal comfort
posted by  Annalise Reichert  on 

I am working on an educational facility and all multi-occupant spaces contain thermostat controls except for one classroom.

4
Thu Sep 12, 2013, 10:39 pm

Vending Machine Rated Power

CI-2009 EAc1.4:Optimize energy performance - equipment and appliances
posted by  Lara Schneider  on 

Does anyone know what the rated power is for vending machines?

3
Thu Sep 12, 2013, 10:30 am

A/V Equipment

CI-2009 EAc1.4:Optimize energy performance - equipment and appliances
posted by  Jennifer Preston  on 

We are compiling the equipment for a multi-floor office renovation. Dow e need to include A/V Equipment? Including ceiling speakers, projectors, projection screens, microphones, etc?

2
Thu Sep 12, 2013, 10:21 am

Threat factor calculation for operable shutters

Pilot-Credits SSpc55:Bird collision deterrence
posted by  Jessica Wuest  on 

Hi, I was wondering how to calculate operable shutters that cover clear glass.

2
Sites Technical Specialist, LEED
USGBC
LEEDuser Premium Member
47 thumbs up
Wed Sep 11, 2013, 9:04 pm

Floor Leveling Product

Healthcare-v2009 IEQc4:Low-emitting materials
posted by  Catherine Blakemore  on 

Does a floor leveling product get listed as a floor coating?

4
Wed Sep 11, 2013, 5:47 pm

Ingress and egress

ND-v2009 NPDp3:Connected and open community
posted by  Colin Day  on 

Hi Eliot, Our project has two vehicle entries on its north side.

7
Sustainable Building Associate, LEED GA
The Institute for the Built Environment
LEEDuser Basic Member
0 thumbs up
Wed Sep 11, 2013, 2:39 pm

Basleine Fan Power credit for an exhaust fan linked to Furnace

NC-2009 EAp2:Minimum energy performance
posted by  Matt Scott  on 

I have an attic that is heated only with a Gas Furnace.

4
Manager, LEED
USGBC
LEEDuser Premium Member
26 thumbs up
Wed Sep 11, 2013, 1:59 pm

Ozonation for Lift Lobby Area

CS-2009 IEQp1:Minimum indoor air quality performance
posted by  Poorva Keskar  on 

The consultant has proposed an Ozonation System (IAQ Management System) for Lift Lobby area.

2
Mechanical Engineer
Integral Group
LEEDuser Expert
342 thumbs up
Wed Sep 11, 2013, 10:24 am

Return Fan included in Baseline Fan Power Calc?

NC-2009 EAp2:Minimum energy performance
posted by  Matt Scott  on 

Another question regarding the baseline fan power calculation in the Tables 1.4 Excel spreadsheet: Does the calculation account for the possibility of a Return Fan in the proposed system?

4
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4460 thumbs up
Tue Sep 10, 2013, 7:48 pm