Hello. I'm working on a C&S project and have a question regarding the documentation of the IEQp1 credit. During the design a single tenant was found to occupy the entire site (700k sf). We worked hand in hand to establish the AHU/RTU outside air quantities. I do not have a plan indicating the tenant's layouts. I also am not documenting the distribution ductwork on the floors. My question is how exactly to document the ventilation. I am thinking that I can do the 62.1 calcs, using a generic set of rooms (conference rooms, offices, lobbies) and drafting a narrative to explain my assumptions. Is there an issue if I use the ventilation calcs that the fit out engineer has developed for their layouts instead?