Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Ceramic Tiles only

CS-2009 IEQc4.3:Low-Emitting Materials—Flooring Systems
posted by   Habitech Distretto Tecnologico Trentino  on 

Hi! We are working on a LEED CS v2009 where only ceramic tiles (flooring+wall base) will be installed as part of the CS scope of works.

5
LEED AP BD+C, O+M, Green Globes Professional
JLL
LEEDuser Basic Member
112 thumbs up
Fri Dec 20, 2013, 11:03 pm

rainwater for greenhouse food production

NC-2009 WEc2:Innovative Wastewater Technologies
posted by  Karl Heitman  on 

We are designing an 150,000 sf industrial production facility in Chicago with a greenhouse on the roof for food production.

3
Default Avatar
President
Heitman Architects Inc
LEEDuser Premium Member
4 thumbs up
Fri Dec 20, 2013, 10:49 pm

VOC Budget Process - If you make a mistake, you can still get it

Schools-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatings
posted by  Walter Currin  on 

Does anyone have any guidance (or graphic/ spreadsheet) in making it through the VOC budget process?

2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Fri Dec 20, 2013, 10:47 pm

R407 F

NC-2009 EAp3:Fundamental Refrigerant Management
posted by  Charline SEYTIER  on 

Has anyone ever documented this prereq. with a system using R407F? It's not part of the drop down list on the form and we're not sure it will comply. Thanks in advance for your help!

2
Sustainability Manager
YR&G
LEEDuser Basic Member
55 thumbs up
Fri Dec 20, 2013, 8:49 pm

Mixed Mode Natural & Mechanical Ventilation...?

NC-2009 IEQc2:Increased Ventilation
posted by  Tony Ricketts  on 

Hi all, I have a project that seems only slightly different than many of the others I've seen posted here.

3
Default Avatar
Mechanical Engineer
CJL Engineering
LEEDuser Basic Member
22 thumbs up
Fri Dec 20, 2013, 8:42 pm

Green Cleaning Policy Signatures

EBOM-2009 IEQp3:Green Cleaning Policy
posted by  Janna Nash  on 

Is a signature required on the EBOM IEQ p3 policy? If so, would it be person assigned as Responsible party, like housekeeping manager, or would it be tenant?

4
Fri Dec 20, 2013, 6:14 pm

Non Green Label Products

EBOM-2009 IEQc3.3:Green Cleaning—Purchase of Sustainable Cleaning Products and Materials
posted by  Amber Hicks  on 

We currently purchase our cleaning products from a small local company.

2
Senior Marketing Manager
Veritiv
LEEDuser Basic Member
3 thumbs up
Fri Dec 20, 2013, 5:51 pm

how to count nule answers

EBOM-2009 IEQc2.1:Occupant Comfort—Occupant Survey
posted by  Patricia Fuertes  on 

We have send the survey to all of the 312 FTE and 270 have answered it, so we comply with the 30% required because they are the 86.5% of the respondents.

2
Fri Dec 20, 2013, 4:55 pm

Residential Walk-Off Mats

NC-2009 IEQc5:Indoor Chemical and Pollutant Source Control
posted by  Ellen Mitchell  on 

I have a university dorm project that has 1 or 2 residential units on ground level opening to the outside and I"m not sure how to advise on the walk off mat requirement.

2
Vice President
WSP Built Ecology
LEEDuser Basic Member
42 thumbs up
Thu Dec 19, 2013, 7:35 pm

Steel and Regional Materials

Healthcare-v2009 MRc3:Sustainably sourced materials and products
posted by  Catherine Blakemore  on 

Can steel count toward the regional materials category? Is it even possible, since the location of where the actual ore was extracted cannot in most cases be traced back to its origin. Or does th

5
Thu Dec 19, 2013, 7:17 pm