Design Process Load requirements?

CS-2009 EAp2:Minimum Energy Performance
posted by  Matt Humphreys  on 

If a mechanical design engineer adds a note on the mechanical schedules stating "AHU capacities shown are based upon 4Watts/S.F.

5
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Wed May 7, 2014, 4:16 pm

Time period

Pilot-Credits SSpc16:Rainwater management
posted by  Anna Korinkova  on 

Our building will implement a stormwater harvesting system.

3
Regional Stormwater Leader
Arcadis North America
LEEDuser Expert
144 thumbs up
Wed May 7, 2014, 2:59 pm

Water quality examples

NC-2009 WEc2:Innovative Wastewater Technologies
posted by  Mitch Gascoyne  on 

Does anyone have a good resource for expected water quality/colour of collected rainwater for toilet flushing?

2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Wed May 7, 2014, 2:47 pm

Process outside buildings

NC-2009 EAp2:Minimum Energy Performance
posted by  LEED Pro Consultant  on 

Hello, Regarding a campus project: We have several buildings (11 small ones) within one campus and several processes going on within the campus, but outside of any building.

3
Wed May 7, 2014, 2:34 pm

Maximum allowable concentration of formaldehyde and other VOCs

NC-v4 EQc4:Indoor air quality assessment
posted by  Youyou Xiong  on 

Table 1 listed the maximum allowable concentrations for target chemicals but except formaldehyde. Why is formaldehyde an exception? Where is the 27 ppb from?

2
Wed May 7, 2014, 2:08 pm

Juvenile Detention Center - Lighting Control

NC-2009 IEQc6.1:Controllability of Systems—Lighting
posted by  Michelle Bombeck  on 

Hello all - We are working on a juvenile detention center and are trying to find a way to comply with EQc6.2.

3
Director of Sustainability
Fentress Architects
LEEDuser Expert
224 thumbs up
Wed May 7, 2014, 3:29 am

CS- SSc4.2- Case 2 for a Mixed-use project larger than 300kSF

CS-2009 SSc4.2:Alternative Transportation—Bicycle Storage and Changing Rooms
posted by  John McFarland  on 

The LEED User Checklist and the LEED Credit Template calculate the number of bike racks in the following way: "For Core and Shell projects that are larger than 300,000 ft2, an allowance is the squa

4
Environmental Engineer
LEEDuser Basic Member
11 thumbs up
Tue May 6, 2014, 7:00 pm

Baseline Model DCV

NC-2009 EAp2:Minimum Energy Performance
posted by  Laura Long  on 

I overlooked the demand control requirement for the baseline system in the energy model, and have been directed by the reviewer to install it in 3 rooms based on calculation numbers, which makes se

3
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Tue May 6, 2014, 2:37 pm

Very confused - Natural Ventilation

NC-2009 IEQc2:Increased Ventilation
posted by  Jeff Potter  on 

My building currently achieves IEQp1 for Mechanical Ventilation rates.

4
Default Avatar
Mechanical Engineer
CJL Engineering
LEEDuser Basic Member
22 thumbs up
Tue May 6, 2014, 2:09 pm

IAQ Testing - Maximum Concentrations

NC-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancy
posted by  Donald Green  on 

Can anyone tell me where the Maximum Concentrations listed in the reference guide came from? Who established them, is there a document or website that can be visited? Thank you,

4
Mon May 5, 2014, 7:49 pm