Forum quick links
DES Option 2 - Clarification
NC-2009 EAc1:Optimize energy performanceposted by Michela Tedeschi on
Hi, we are working on a LEED NC 2009 project consisting of an office building, where the thermal energy (heating via hot water) is generated and distributed by means of a municipal grid (about 40 m
PU foam
NC-2009 IEQc4.1:Low-emitting materials - adhesives and sealantsposted by Emmanuel Pauwels on
Under what category would a 1-compnent mounting Polyurethane foam fall and consequently what would be the maximum VOC level allowed?
No autosizing of equipment on proposed?
NC-2009 EAp2:Minimum energy performanceposted by Saju Varghese on
Is there a reason why the equipment on the proposed can not be autosized?
Exhaust Fan Testing in a Laboratory
EBOM-2009 IEQp1:Minimum indoor air quality performanceposted by Alexis Thompson on
I am working on a laboratory project and we are gearing up to perform the exhaust fan testing internally.
Zero lot line existing building renovation
NC-2009 SSp1:Construction activity pollution preventionposted by Kim Shinn on
This project is a re-skin, and interior re-fit. Complete preservation of the structure. There was no site soil distrubance. What is required for SSp1 documentation?
On-site renewable energy
NC-2009 EAp2:Minimum energy performanceposted by Lise Dannesboe on
Hi! We are trying to offset as much as possible from our electricity consumption with on-site PV.
Sediment Basin
NC-2009 SSp1:Construction activity pollution preventionposted by Paula Hernandez on
Hello again, we are working on a project for which we are installing a sediment basin. According to EPA we could use the calculation of 3600 ft3 / acre drained to size it.
Number of features required to be met?
Pilot-Credits EQpc78:Design for active occupantsposted by Crista Shopis on
We have submitted this pilot credit for review, we included documentation for 7 of the 11 features listed in the credit description that qualify as satisfying the credit.
Emergency Exits
NC-2009 IEQp2:Environmental Tobacco Smoke (ETS) controlposted by Dave Hubka on
Hello all, Regarding emergency exits, we recieved the following review comment on our LEED Volume program submission: "Emergency exits must prohibit smoking within 25 feet.
dynamic glass
CS-2009 EAp2:Minimum energy performanceposted by Dave Hubka on
Can benifits of glass, that automatically change VLT and SHGC based on the position of the sun, be garnered in the proposed model?