Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Solar Water Heater Savings Calculation

NC-2009 EAc1:Optimize Energy Performance
posted by  Jimmy Sparkman  on 

I need to document, through LEED NC 2009, my energy savings through the use of a solar water heater. I'm not certain if there is a savings estimating spreadsheet out there for use or not.

3
Tue Sep 9, 2014, 3:21 pm

Electric meters for interior lighting and receptable loads

CS-2009 EAp2:Minimum Energy Performance
posted by  Toni Herena Montull  on 

Hi, In a Core and Shell model, for EAp2 (eQUEST), a LEED reviewer told me to define lighting and receptable loads meters.

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Tue Sep 9, 2014, 8:34 am

Supplemental Calculator for Residential

NC-2009 IEQc8.1:Daylight and Views—Daylight
posted by  Lauren Fakhoury  on 

I'm documenting this credit for an apartment building using the v3 supplemental daylight and views calculator.

2
Director of Sustainability
DBR Engineering Consultants
LEEDuser Basic Member
244 thumbs up
Mon Sep 8, 2014, 5:48 pm

Glass manifestation

CI-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealants
posted by  Akos Brandecker  on 

Does anyone know if glass manifestation (decorative films on glass panels) applied on-site falls under any of the IEQ credits and if yes, what requirements it has to meet exactly? Thank you.

4
LEED-AP BD+C
GREENSQUARE
LEEDuser Expert
261 thumbs up
Mon Sep 8, 2014, 3:51 pm

Completing Table for MRc4 - MRc7

NC-2009 MRc4:Recycled Content
posted by  Nicholas Klever  on 

I have input all of the information into the form table for these Materials and Resources credits, but the table indicator at the bottom of the table still reads "Incomplete".

12
Default Avatar
Intern Architect
Bailey Edward Architecture
LEEDuser Basic Member
0 thumbs up
Sat Sep 6, 2014, 3:33 pm

Fixture Usage Group

NC-2009 WEp1:Water Use Reduction—20% Reduction
posted by  Mike D  on 

Hi, The project has male and female restrooms with urinals in the male restrooms, as well as unisex restrooms without urinals in the basement and ground levels.

7
Fri Sep 5, 2014, 9:14 pm

EAp2 Form

CS-2009 EAp2:Minimum Energy Performance
posted by  Lily Li  on 

in EAp2 Form Summary shows "N", but no error information provided, is this Form wrong?

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Fri Sep 5, 2014, 8:51 pm

Discrepancy in graywater volume between Engineer & ELED

NC-2009 WEp1:Water Use Reduction—20% Reduction
posted by  Maya Karkour  on 

Dear all, We are consulting for a big retail shopping mall.

3
Default Avatar
EcoConsulting
LEEDuser Basic Member
549 thumbs up
Fri Sep 5, 2014, 2:45 pm

Sampling Locations

NC-v4 EQc4:Indoor air quality assessment
posted by  Courtenay Griffin  on 

Recognizing the issues already under discussion regarding the analytical methods and the maximum contaminant levels presented in LEED v4...

2
Fri Sep 5, 2014, 1:51 pm
2
Fri Sep 5, 2014, 1:32 pm