Confused about Perf periods and 2-yr contract for offsite REC's

EBOM-2009 EAc4:On-Site and Off-Site Renewable Energy
posted by  Wendy Parker, LEED AP  on 

We purchased REC's (Texas products) for backdates 3/13 to 3/14 AND going forward 3/14 to 3/15 to cover both the Perf Period AND the 2 yr contract requirement for the credit.

2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Tue Oct 7, 2014, 1:19 pm

Addition added after documentation has been submitted

NC-2009 MPR2:Must be a complete, permanent building or space
posted by  Angela Bickford  on 

I think I know this answer to this, but I can't find an answer anywhere so I would like someone else's opinion. I'm working on a LEED for schools project. About 3/4 of the building was renovated.

2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Tue Oct 7, 2014, 12:21 pm

Concrete Washout

NC-2009 SSp1:Construction Activity Pollution Prevention
posted by  Paula Hernandez  on 

Hello everyone, we are working on a project in an estate, part of this estate is the current LEED project, with its own LEED boundary.

2
Regional Stormwater Leader
Arcadis North America
LEEDuser Expert
144 thumbs up
Mon Oct 6, 2014, 12:00 pm

Wind renewable energy- Green Powert

NC-2009 EAc6:Green power
posted by  Ramesh Narayanan  on 

One of our client has already own the wind turbine for 100% of the buildings electricity. They want to show that wind turbine power to meet the LEED requirement.

8
Default Avatar
LEED-AP BD+C
Leighton Contractors Philippines Inc.
LEEDuser Premium Member
22 thumbs up
Sat Oct 4, 2014, 9:20 pm

Modeling Heat Reclaim in EAp2 v2009

NC-2009 EAp2:Minimum Energy Performance
posted by  Mario S.  on 

Hello, We are working on a project that uses heat reclaim as a source of energy for service hot water.

4
Design Engineer, LEED AP (BD+C)
Energy Concepts
LEEDuser Basic Member
5 thumbs up
Sat Oct 4, 2014, 8:56 pm

Landscaped area included or only irrigated landscape areas?

NC-2009 WEc1:Water Efficient Landscaping
posted by  Kevin Gilleran  on 

Are all landscaped areas within the LEED project boundary included in the calculations for this credit or just irrigated landscaped areas?

2
Default Avatar
president
Gilleran Energy Management, Inc.
LEEDuser Premium Member
18 thumbs up
Fri Oct 3, 2014, 12:19 pm

WaterSense Labeled Products

NC-v4 WEp2:Indoor water use reduction
posted by  Mark Zoeteman  on 

Reference Guide indicates WaterSense label requirements are mandatory in U.S.

2
Technical Director, LEED
USGBC
LEEDuser Expert
225 thumbs up
Thu Oct 2, 2014, 11:45 pm

Natural ventilation

NC-2009 IEQp1:Minimum IAQ Performance
posted by  Gaston Michaud  on 

We are working on a residential core and shell project, and we are having some issues with the compliance of ASHRAE 62-1 ventilation requirements. Basically, the building has apartments on each lon

2
Default Avatar
Ecology and Environment, Inc.
LEEDuser Basic Member
16 thumbs up
Thu Oct 2, 2014, 8:30 pm

agricultural site, previously graded?

NC-2009 SSc5.1:Site Development—Protect or Restore Habitat
posted by  Mónika Egyed  on 

Hi, the project of ours has a site with current agricultural use, there is only 1-2% of the site with native vegetation. In this case, can we use Option 2 - previously developed or graded?

3
Wed Oct 1, 2014, 7:42 pm

Speciality

EBOM-v4 INc2:LEED Accredited Professional
posted by  Ralf Lehmann  on 

Is a LEED AP BD+C also eligible for earning the credit under EBOM?

5
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Tue Sep 30, 2014, 12:30 am