Forum quick links
Framed assembly U-value calculated by WinISO 2D Software
NC-2009 EAp2:Minimum Energy Performanceposted by Mayank Bhatnagar on
Hi, As per reviewer comment the calculation for U-value of whole window assembly (including frame) used for the Proposed case windows can be demonstrated by different method such as NFRC rating, Wi
ESC gap between the excavation phase and construction phase
NC-2009 SSp1:Construction Activity Pollution Preventionposted by Meghan Ward on
I am working on a 2-building campus project where an ESC plan was implemented during excavations phase (bulk earthworks) of the whole campus.
"open bottom planters"
CS-2009 SSc5.2:Site Development—Maximize Open Spaceposted by Charles Nepps on
I know this has come up before, but haven't been able to find a precise answer. What exactly is an open bottom planter?
Manually Watering instead of Temporary Irrigation?
NC-2009 WEc1:Water Efficient Landscapingposted by Patrice McVeigh on
Hi All, For a water efficient landscape, with native plants and no requirements for irrigation except a temporary irrigation system for 12 or 18 months. Can a person within the maintenance team o
Responsible person
NC-2009 SSc1:Site Selectionposted by Lilian Seow on
Who should be the responsible person signing the letter template for this credit?
Prviate Shuttle System Used Solely
NC-2009 SSc4.1:Alternative Transportation—Public Transportation Accessposted by Mary Kay on
We are going to use a private company shuttle system since there is no bus stop within 1/4 mile of the site.
Only one bus line, but within an extensive public trans system
NC-2009 SSc4.1:Alternative Transportation—Public Transportation Accessposted by Jeff Ross-Bain, PE, LEED Fellow, WELL AP on
Hi All, I know there are numerous variations on this issue but I do feel compelled to open another... Our project, located deep within a densely occupied major US city, has bus stops nearby but onl
Alternative Transportation: Alternative refueling stations 3%
NC-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehiclesposted by Rezkar Abdulmajeed on
I am working on the first LEED project in campus. There is zero parking provided within the LEED project boundary staff.
Native species
NC-2009 SSc5.1:Site Development—Protect or Restore Habitatposted by Stella Stella on
Hi, We are working on a project in Singapore.
Gross floor area vs. Regularly Occupied Area
Schools-2009 PIf3:Occupant and Usage Dataposted by Ashley Love on
I just received my design preliminary review back for a Schools 2009 project and they commented on PIf3 that the total regularly occupied area reported was inaccurate because some of my gross areas