NC-v4.1 EQc9:Acoustic Performanceposted by Martha Norbeck on
The credit language reads all "occupied spaces." Is that really the intent? Or is it all "REGULARLY occupied" spaces?
Baseline Lighting Control
CI-v4 EAc2:Optimize energy performanceposted by Rajat Wadhwa on
I am modeling a space which has some spaces which have area greater than 250 ft2, now this is an office space and using building area method LPD comes out to be 0.9 W/ft2, and these spaces ar
MEP-Calculator for LEED ID+C
CI-v4 EAc2:Optimize energy performanceposted by Rajat Wadhwa on
For MEP Calculator when Inputting the capacity of the chiller and AHU should I input the values that I am getting from my model or input the values from the CD Document which represent the capacity
Water Feature Include or Exclude?
EBOM-v4.1 WEc1:Water Performanceposted by Summer Minchew on
Has anyone had experience with including vs excluding site water features (fountains)?
Retail basline HVAC
CS-v4 EAc2:Optimize energy performanceposted by Julio Fernandez Amodia on
Hi to all,
On-site Renewable Energy
Warehouses-NC-v4 EAc5:Renewable energy productionposted by Salomee Hinque on
Hi all,
For a new construction warehouse project, going for LEED Platinum and LEED Zero Carbon:
Modeling DHW system for CI project
CI-v4 EAc2:Optimize energy performanceposted by Rajat Wadhwa on
Hi,
FTE for Data center
Data-Centers-NC-v4 LTc6:Bicycle facilitiesposted by Carlos Bueno on
What would be the correct FTE for a Data Center building?
Nuclear Power
NC-v4 EAc7:Green power and carbon offsetsposted by Kelsey Lenhoff on
Is Nuclear Power ever considered to be a Green Power or Carbon Offset source especially in the eyes of LEED?
IPc101 - Integrative Process - good practice
Pilot-Credits IPpc101:Integrative Processposted by Kelvin Chan on
It is recommended to set up an integrative team with all stakeholders at the early stage, prior to commencement of the project, the team shall establish an Integrative Process (IP) Team.